My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PROJC01814 (3)
CWCB
>
Loan Projects
>
DayForward
>
1001-2000
>
PROJC01814 (3)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/9/2011 11:23:36 AM
Creation date
7/28/2008 3:03:23 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C150180
Contractor Name
Pinewood Springs Water District
Contract Type
Loan
Water District
4
County
Larimer
Loan Projects - Doc Type
Approval Letter
Supplemental fields
Water Division
1
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />Background <br /> <br />The District is located approximately 11 miles east of Estes Park and encompasses approximately 700 <br />acres. The District provides water to 268 taps (266 households and 2 businesses) with a projected total <br />of 350 taps at planned build out, estimated to occur by 2015. The District draws surface water from the <br />Little Thompson River and processes this water for domestic consumption with a micro-filtration plant. <br /> <br />The District has been severely impacted by water shortages during the past several years. During the <br />summers of2000 through 2002 the Little Thompson River, the District's primary source of water, ran <br />dry at times, due to the severe drought conditions. Given the persistent nature of drought over the past <br />few years, the District concluded that the Little Thompson River cannot be considered a reliable and <br />continuous supply of raw water. <br /> <br />Based on that conclusion the District hired the services of McLaughlin Water Engineers to prepare a <br />planning document study to evaluate the needs ofthe District's existing water system. The Study <br />identified the following needs: <br /> <br />. Construct a raw water storage facility to be utilized when the river cannot meet <br />demands and to secure a reliable water source. <br />. Address ongoing distribution line problems. <br />. Increase capacity ofthe District's 36 gpm water treatment rate to 50 gpm needed to <br />accommodate full build-out. <br />. Address impacts of the Bull Creek fire on their treatment gallery. <br /> <br />Based on the recommendations ofthe study, the District, by election, was approved to incur debt up to <br />$3,000,000, for the purposes of financing the improvements identified above. To-date, the District has <br />acquired four loans to complete various improvements to its system; a 1998 General Bond with an <br />outstanding balance of $250,000, two loans with Colorado Water Resources and Power Development <br />Authority (CWR&PDA) with a combined outstanding balance of$821,998, and a $2,054,189 loan from <br />CWCB. The requested $757,500 loan increase from the CWCB, combined with the existing loans, will <br />place the District's outstanding debt at $3,883,687. The District has the ability to increase its debt <br />service to $3,890,000, based on its 2007 assessed evaluation of$7,788,810. The District is scheduled to <br />hold an election in May of 2008 to increase its debt service to $3,890,000. <br /> <br />In June 2004, the District provided a feasibility report to the CWCB, prepared by McLaughlin Water <br />Engineers that assessed the water supply alternatives to meet current and future needs of the District. <br /> <br />Table 1 below is a brief summary of the major project elements presented in the original feasibility study, <br />compared with the projected final construction costs. <br /> <br />2 <br />Flood Protection. Water Project Planning and Financing. Stream and Lake Protection <br />Water Supply Protection. Conservation Planning <br />
The URL can be used to link to this page
Your browser does not support the video tag.