My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
C150168 Feasibility Study
CWCB
>
Loan Projects
>
DayForward
>
0001-1000
>
C150168 Feasibility Study
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/27/2011 10:26:08 AM
Creation date
7/28/2008 3:02:27 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C150168
Contractor Name
Fulton Irrigation Ditch Company
Contract Type
Loan
Water District
1
County
Adams
Bill Number
SPL
Loan Projects - Doc Type
Feasibility Study
Supplemental fields
Water Division
1
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
29
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />CWCB Construction Fund Loan Application <br /> <br />4. Please provide a brief description of the owner's existing water supply facilities and describe <br /> <br />any existing operational or maintenance problems. Attach separate sheets if needed, and a map <br /> <br />of the service area. We have a diversion on the South Platte River in Adams County <br />at approximately 100th Avenue, Late last Slll1UTIer a leak in the spillway was <br />aiscovered which if not repaired will lead to a failure of the entire diversion <br />structure. See attached Tetra Tech RMC report for details. <br /> <br />For existing facilities indicate: <br /> <br />Number of shareholders <br /> <br />220 <br /> <br />or Number of customers served <br /> <br />n/a <br /> <br />Current Assessment per share $ 30. 00 <br /> <br />Number of shares <br /> <br />7, 1 85 <br /> <br />Number of acres irrigated approximately 37,628 <br /> <br />Part B. - Description of the Project <br />1. Name of the project or facility The Fihlton Irrigation Ditch Canpany Spillway Repair <br /> <br />2. Purpose of this loan application. Check one. <br />New project <br />X Rehabilitation or replacement of existing facility <br />Enlargement of existing facility <br />Emergency Repair <br />Other (describe) <br /> <br />3. If the project is for rehabilitation of an existing reservoir, is the reservoir currently under a <br />storage restriction order from the State Engineer? YES _ NO _ n/a <br /> <br />4. General location of the project. (Please include county, and approximate distance and direction <br />from nearest town, as well as legal description, ifknown. Project is located in Adams <br />County 22 miles south of the City of Brighton. See attached Tetra Tech RMC <br />report tor detalls. <br /> <br />5. Please provide a brief narrative description of the proposed project including purpose, need, <br />facilities, type of water uses to be served and service area. Attach separate sheet, ifneeded. The project <br />involves the use of sheet pile to stabalize the existing spillway/diversion strucuure <br />( ln the South Platte River) and the injection of grout into the existing concrete <br />structure to fill the void left by the river undennininq the structure. Water <br />diverted is used primarily for the irrigation of vegetables and other agriculture. <br />Tholl9h just unner 1/1 of the shrlrps in thp nit~h rlrp }-ping ~hrlngPd for rll1gJl'1entation. <br /> <br />Water Right: 205 CFS. Average water diverted per year: 30, ~: acre-feet. <br />app . <br /> <br />6. Will the acquisition of additional water rights be necessary? YES <br /> <br />NO X <br /> <br />2 <br /> <br />CFLA902 <br />
The URL can be used to link to this page
Your browser does not support the video tag.