My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PROJC01804 (3)
CWCB
>
Loan Projects
>
DayForward
>
1001-2000
>
PROJC01804 (3)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/11/2011 8:56:04 AM
Creation date
7/28/2008 3:01:33 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C150138
Contractor Name
Supply Irrigating Ditch Company
Contract Type
Loan
Water District
0
County
Boulder
Loan Projects - Doc Type
Approval Letter
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
13
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
� <br />� ' � � � � �� <br />Colorado Water Conservation Board <br />Department of Natural Resources <br />� 1313 Sherman Street, Room 721 <br />Denver, Colorado 80203 <br />Phone: (303) 866-3441 <br />FAX• (303) 866 4474 <br />www.cwcb.stai:e.co.us M� M O R A N D U M <br />TO: Colorado Water Conservation Board Members <br />FROM: John Van Sciver �V� <br />Mike Serlet, P.E., Chief <br />Water Supply Planning inance Section. <br />DATE: <br />SUBJECT <br />January 16, 2001 <br />Agenda Item 11 b., January 24-25, 2Q01 Board Meeting <br />The Supply Irrigating Ditch Company <br />�� <br />�:, <br />��:� • <br />�w�±i -' <br />�.�-,- <br />Biil Owen> <br />Governor <br />Greg E. Walcher <br />Executive Director <br />Rod Kuharich <br />C�'CB Direc[o� <br />��n M�A���rre <br />Deputy Direc[cr <br />�' 1 �O I � L� <br />----------------------- <br />introduction <br />The Supply Irrigating Ditch Company (SIDC) is applying for a loan in amount of $1,700,000 to <br />� rehabilitate Knoth Reservoir Dam. The estimated total cost of the project is $1,900,000. Please <br />see the attached project summary and map. <br />Backqround <br />The SIDC, located in Bouider County, operates the Supply Ditch for the benefit of the <br />shareholders by providing direct flow irrigation water. The Suppiy Ditch diverts from St. Vrain <br />Creek near Lyons and delivers water through a 15 -mile ditch system to the 8,500-acre service <br />area as a partiai supply. The Supply Ditch operates without and equalizer reservoir and it is <br />difficult to control direct flow deliveries. The SIDC has an opportunity to acquire a perpetual <br />easement to use the Knoth Reservoir as well as a conditional water right to store 542 acre-feet. <br />The reservoir would be used to equalize ditch fiows and store the conditional decree. The <br />Company would pay the cost of the rehabilitation as a condition of acquiring these rights. <br />r� <br />� <br />Feasibility Studies <br />Duane Smith, P.E., (Smith Geothechnical, Fort Collins), has completed the Feasibility Study. The <br />study includes an assessment of alternatives available for rehabilitation of the Knoth Reservoir <br />Dam. <br />The Supply Irriqatinq Ditch Company <br />The SIDC is a mutual ditch company and a non-profit corporation registered in the State of <br />Colorado. There are 160 shareholders and 400 shares of stock. The SIDC has the power to set <br />annual assessments to be paid by the shareholders, the power to cut off water deliveries to <br />shareholders that fail to pay their assessments, and the power to offer stock for sale to pay <br />back assessments. <br />Flood ProCection • bVater Project Planning and Financing • Sfream and Lake Prolection <br />Water Supply Prolection • Conservation Plannina <br />
The URL can be used to link to this page
Your browser does not support the video tag.