My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PROJC01804 (3)
CWCB
>
Loan Projects
>
DayForward
>
1001-2000
>
PROJC01804 (3)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/11/2011 8:56:04 AM
Creation date
7/28/2008 3:01:33 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C150138
Contractor Name
Supply Irrigating Ditch Company
Contract Type
Loan
Water District
0
County
Boulder
Loan Projects - Doc Type
Approval Letter
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
13
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />Supply Irrigating Ditch Co. <br />March 24-26, 2003. <br /> <br />Agenda Item 24e <br />(Updated March 28, 2003) <br /> <br />Credit worthiness: SIDC has one existing debt in amount of $21,045 to the First National Sank <br />of Longmont, upon which all payments have been made as agreed. A condition of the CWCS <br />loan will be that the bank subordinates its position so that the CWCS has a first position on the <br />collateral (the pledge of revenues and the project.) Table 2 shows the Financial Ratios and <br />indicates, with the exception of cash reserves, average to strong ability to repay with the project <br />in place. <br /> <br />Financial Ratio Without With <br /> the project The Droject <br />Operating Ratio (revenue/expense) 126% 115% <br />weak: less than 100% (strong) (average) <br />average: 100% - 120% <br />strona: areater than 120% <br />Debt Service Coverage Ratio 1114% 130% <br />(revenues-expenses)/debt service (strong) (strong) <br />weak: less than 100% <br />average: 100% - 125% <br />strona: areater than 125% <br />Cash Reserves to Current Expense 7% 8% <br />weak: less than 50% (weak) (weak) <br />average: 50% - 100% <br />strona: areater than 100% <br />Annual Cost per Ac-Ft (9,500/9,745 ac-ft) $7.50 $12.93 <br />weak: greater than $20 (strong) (average) <br />average: $10 - $20 <br />strona: less than $10 <br /> <br />Table 2. Financial Ratios <br /> <br />As security for the loan the SIDC will pledge assessment revenues backed by assessment <br />covenant and the project itself. This security is in compliance with CWCS Loan Policy #5 <br />(Collateral). <br /> <br />Recommendation <br />Staff recommends a CWCS Small Project loan from the Construction fund not to exceed <br />$1,000,000, to the Supply Irrigating Ditch Company to rehabilitate and enlarge the Knoth <br />Reservoir. The recommended term of the loan is 30 years and the recommended blended <br />interest rate is 3% (3.079% Annual Percentage Rate.) Security for the loan will be a pledge of <br />assessment revenues backed by assessment covenant and the project itself (an easement for <br />use of the Knoth Reservoir, and the storage rights), in accordance with CWCS Loan Policy #5. <br /> <br />Staff further recommends that final approval of the loan be conditioned upon standard <br />contracting provisions of the CWCS, including the 1 % loan origination fee charged in <br />accordance with CWCS Policy #16. <br /> <br />Action taken bv the CWCS March 26. 2003 <br />The CWCS approved the Staff Recommendation, with the revisions shown above. <br /> <br />cc: Dan Grant, Secretary-Treasurer, Supply Irrigating Ditch Company. <br />Duane Smith, P.E., Smith Geotech. <br />Linda Bassi, AGO <br /> <br />Attachment <br /> <br />C:\Proj-New\SupplylrrCo303memo <br />L:\boardmem\Mar03\24e - Supply Irrigating Ditch Co <br /> <br />4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.