My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
C150109 Project Summary
CWCB
>
Loan Projects
>
DayForward
>
0001-1000
>
C150109 Project Summary
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/10/2011 9:47:21 AM
Creation date
7/28/2008 3:01:10 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C150109
Contractor Name
Larimer and Weld Irrigation Company, The
Contract Type
Loan
Water District
2
County
Weld
Bill Number
MC3
Loan Projects - Doc Type
Project Summary
Supplemental fields
Water Division
1
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
Page 1 of 1
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />LARIMER AND WELD IRRIGATION COMPANY <br />CHECK STRUCTURE REHABILITATION <br /> <br /> <br />Project Description <br /> <br />The Larimer and Weld Irrigation Company operates a 40-mile system of supply ditch, <br />including control structures, checks, and headgates. This project was to rehabilitate lO existing <br />check structures, construct one new check structure on the Larimer and Weld Ditch, and to <br />refinance the cost of 3 check structures constructed in 2002 along the ditch. The new check <br />structures consisted of Obermeyer pneumatically operated gates to automatically check and control <br />the ditch. The gates are opened and closed by a l2-volt DC power air pump, which inflates a <br />durable rubber bladder on the downstream side of the gate to raise and lower the gate. The project <br />commence construction in the fall of 2003 and was completed in the summer of 2004 by Kiefer <br />Concrete, Inc., and Barker Construction, Inc., both from Fort Collins, Colorado. <br /> <br />Proiect Data <br /> <br />Sponsor: Larimer & Weld Irrigation Co. County: Weld Water Source: Cache La Poudre <br /> <br />Terms of Loan: $1,000,000@2.75% for 30-yrs. Substantial Completion Date: August 1,2004 <br /> <br />Design Engineer: Smith Geotechnical, Inc. - Fort Collins, Colorado <br /> <br />Construction Contractor: Kiefer Concrete, Inc. - Fort Collins, Colorado <br />Barker Construction, Inc. - Fort Collins, Colorado <br /> <br />Average Annual Diversion - ~ acre-feet <br />?Lj C't" c' ..-1 <br />5r;{ <br />u <br />
The URL can be used to link to this page
Your browser does not support the video tag.