Laserfiche WebLink
Scope of Work <br />Task 5 Blaine Dwyer of Boyle Engineering will perform a pipeline study for <br />delivering water to be made available by the leases to the Front Range. The alignment, <br />size, lift stations, water quality, treatment options and cost. <br />Deliverables will be maps of possible routes, size and other options, cost estimates. <br />Budget <br />700 hours @ $193.00/hr for Principal $72,375.00 <br />300 hours @ $162.00/hr for Senior II $48,600.00 <br />400 hours @ $113.00/hr for Associate $45,200.00 <br />Total $166,175.00 <br />