My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Arkansas - LAVWCD - Super Ditc_Application_July2008
CWCB
>
Alt Ag Water Transfer Grants
>
DayForward
>
Arkansas - LAVWCD - Super Ditc_Application_July2008
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/18/2015 1:49:44 PM
Creation date
7/22/2008 9:39:11 AM
Metadata
Fields
Template:
Alt Ag Water Transfer Grants
Basin Roundtable
Arkansas
Applicant
Lower Arkansas Valley Water Conservancy District
Description
Super Ditch Company
Board Meeting Date
7/22/2008
Contract/PO #
C150427
Alt Ag Water - Doc Type
Grant Application
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
38
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Alternative Agricultural Water Transfer Methods --Grant Application Form <br />January 2t}l18 <br />Task F - Corn Fallowing Study <br />Year Production <br />Costs <br />~i Fallowing Costs <br />$ Advisory <br />Personnel <br />COStS Total <br />$ <br />2008 1,860.65 119.20 3.000 4,979.85 <br />2009 3,045.75 65.65 3,000 6,111.40 <br />2010 4.44$.45 -0- 4,000*~` 8,448.45 <br />TOTAL 9, 354.85 184.85 10, 000 19, 539.70 <br />*Dr. Bartolo, Dr. t3errada and Jerrery i ranee approximately nu Hours L ~~u~nour <br />** Bartolo, Berrada and Tranel-approximately 80 hours@ $501hour <br />Optional Task G -Report on Water Leasing and Super Ditch Company <br />Attorneys from Trout, Raley, Montano, Witwer & Freeman, P.C.: 200 hours at $190 per hour <br />(average) _ $38,000, plus reproduction costs of $2,000 for a total of $40,000. <br />Total Budget <br />Tasks Budget <br />A - C: Engineering and Economics $334, 210 <br />D; Water Quality 122,496 <br />E: Antitrust 17,500 <br />F: Corn Fallowing 19,540 <br />G: Comprehensive Report (optional) _40,a0D <br />Total ProjectlProgram with matching $533,746 <br />IV. SCHEDULE <br />The Project is expected to take 12 months to complete once contracts are signed with <br />the CWCB and contractors. Schedules by task are set forth below in tabular form. <br />33 <br />
The URL can be used to link to this page
Your browser does not support the video tag.