Laserfiche WebLink
Alternative Agricultural Water Transfer Methods -Grant Application Farm <br />January 2(108 <br />• Identify right-of-way corridors and significant property barriers <br />• Recommend a preferred alignment <br />2. Refine Pump Station concepts <br />• Further develop the pump station concepts -pumping head, pump size & no. of pumps per <br />pump station, pump type <br />• Refine pump station siting based on hydraulic considerations, environmental obstacles, <br />electrical, etc. (ID a range or radius of site locations for each pump station) <br />• Develop pump station layout concepts <br />• Develop intake facility (1st pump station) concepts <br />Deliverable: Recommended pipeline alignment, capacity, and configuration, preliminary cast <br />estimate, and construction schedule for one or more pipelines that can deliver water from the Ft <br />Lyon Canal and upstream on the Arkansas River to northeastern EI Paso County, i.e., to serve <br />Pikes Peak Regional Water Authority. <br />Task C - Delivered Water Quality <br />it is likely that only raw water will be delivered to potential customers and that any treatment <br />required will be their responsibility. The quality of the water delivered will likely have some <br />influence on the price a customer would be willing to pay; therefore HDR will further examine <br />the effects that a rotational fallowing program will have on the water quality of the Arkansas <br />River and the basin as a whole. It is also expected that agricultural return flows will be <br />decreased along the Arkansas River, thereby having an effect an the water quality (see Task D <br />below). <br />The analysis will focus on the fallowing constituents: <br />• Nutrients <br />• Metals <br />• Temperature <br />• E. Cali <br />The areas that will be focused on will be: <br />• Pueblo Reservoir <br />• Just below Pueblo Reservoir <br />• The Arkansas above the City of Pueblo <br />• The Arkansas just below Fountain Creek and the City of Pueblo <br />• One location further downstream to be determined at a later date <br />The quality of water affects the treatability and has an effect on the value. The cast to treat <br />raw water to potable quality will be examined far each of the above diversion paints. <br />Deliverable: A Summary Report will be prepared covering Tasks and C, which includes <br />pipeline alternatives and recommendations, storage alternatives the recommendations, and water <br />zs <br />