My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SPDSS_WatRightScope_20021117
CWCB
>
Decision Support Systems
>
DayForward
>
SPDSS_WatRightScope_20021117
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/26/2011 8:30:16 AM
Creation date
7/17/2008 10:55:44 AM
Metadata
Fields
Template:
Decision Support Systems
Title
SPDSS Phase 1 & 2 - Relational System Integration and Water Rights Administration Component
Description
The Scope of Work for the Relational System Integration and Water Rights Administration components of the South Platte Decision Support System.
Decision Support - Doc Type
Scope of Work
Date
11/17/2002
DSS Category
Surface Water
DSS
South Platte
Basin
South Platte
Contract/PO #
C153966
Bill Number
SB01-157, HB02-1152, SB03-110, HB04-1221, SB05-084, HB06-1313, SB07-122
Prepared By
CWCB
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
36
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Task 157 -Coordination with Consultant Team <br />Objective: <br />Maintain open communication of activities and results with other consultants to benefit SPDSS <br />development efficiency and quality. <br />Approach: <br />157.1 Advisory Meetings Prepare for and participate in three advisory meetings. <br />157.2 SPDSS Coordination. Schedule up to ten meetings (7 in Denver and 3 by phone) to <br />communicate with State and other consultants about data needs, results, issues, progress etc. <br />during SPDSS development. Also evaluate needs and propose plans for system <br />enhancements based on feedback from the State and consultants. <br />Deliverables: <br />157.1 RTi staff will prepare for and participate in advisory meetings, at a level coordinated with <br />the SPDSS consultant and state management team. <br />157.2 Results from coordination meetings will be documented in memoranda, as appropriate. <br />Task 158 -Project Management <br />Objective: <br />To track work accomplished, to maintain budget and schedule, and to regularly report the status <br />of work activities. In addition, promote communications between the Consultant and the State <br />and between the Consultant and other SPDSS Consultants. <br />Approach: <br />158.1 Progress Reports and Invoices. Prepare and present to the State 24 monthly progress <br />reports that include the following three components: <br />A Work Activity Description that describes work accomplished that month and percent <br />complete for each Subtask presented in the Budget. <br />A Task Summary that describes the Budget, Costs to Date, Percent Spent, Percent Complete, <br />Estimated Cost to Complete, and Surplus or Shortage. Note this report is expected to <br />identify problem areas whenever the Percent Complete is less than the Percent Spent. Also, <br />the Surplus (+) or Shortage (-), which is the difference between the Budget and the Estimated <br />Cost to Complete, will quantify the magnitude of potential savings or problems. <br />^ A Project Summary that describes technical, budget and schedule concerns for the Project. <br />
The URL can be used to link to this page
Your browser does not support the video tag.