My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SPDSS_WatRightScope_20021117
CWCB
>
Decision Support Systems
>
DayForward
>
SPDSS_WatRightScope_20021117
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/26/2011 8:30:16 AM
Creation date
7/17/2008 10:55:44 AM
Metadata
Fields
Template:
Decision Support Systems
Title
SPDSS Phase 1 & 2 - Relational System Integration and Water Rights Administration Component
Description
The Scope of Work for the Relational System Integration and Water Rights Administration components of the South Platte Decision Support System.
Decision Support - Doc Type
Scope of Work
Date
11/17/2002
DSS Category
Surface Water
DSS
South Platte
Basin
South Platte
Contract/PO #
C153966
Bill Number
SB01-157, HB02-1152, SB03-110, HB04-1221, SB05-084, HB06-1313, SB07-122
Prepared By
CWCB
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
36
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Approach: <br />139.1 Add to the StateDMI and/or TSTooI Applications Appropriate Functionality of the <br />Demandts Application. The existing Demandts executes approximately 65 commands to <br />create StateMod historical diversion time series, demand time series, and updates to the <br />diversion and well station files. The functionality of each command will be evaluated in <br />Task 152. Commands that are deemed necessary will be incorporated into the StateDMI <br />and/or TSTooI applications by adding menus to the StateMod menu for each StateMod file. <br />Command editor dialogs will be created for each resulting command. Interaction with <br />HydroBase will occur using stored procedures and will utilize technology upgrades described <br />in Task 155. <br />Deliverable: <br />139.1 An updated StateDMI and/or TSTooI application, with updated documentation, that <br />incorporates the necessary features of the existing DemandTS application, with new <br />graphical editors for each command. <br />Task 140 -SPDSS TSTooI Enhancements <br />Objective: <br />Update TSTooI to be consistent with other SPDSS enhancements, including enhancing <br />performance similar to StateDMI, including additional time series types (e.g. real-time, <br />MODFLOW, etc.), and implementing an integrated map interface. <br />Background: <br />Because of TSTooI's breadth and extensive functionality it is expected to continue to operate <br />independently. Therefore it is not expected to be included as a part of StateDMI. Other CDSS <br />components, including StateDMI, StateView/CWRAT, and the StateMod GUI have, over time, <br />been updated to utilize the time series viewing components that are the focus of TSTooI. In <br />order to promote overall consistency in tools and to simplify maintenance, efforts will be made <br />to utilize TSTooI features in other applications, as appropriate. For example, the ability to <br />describe a time series product in a "template" will be consistent and use the new features <br />developed in TSTooI. <br />Approach: <br />140.1 Add Support for New Time Series Data. Several enhancements to HydroBase and other <br />components will occur in other tasks (e.g., changes to real-time data in Task 109). In this <br />task TSTooI will be updated to be consistent with other CDSS tools and use available data. <br />For example, TSTooI will allow additional real-time time series data (e.g., discharge, stage, <br />and reservoir elevation) to be selected, viewed, and manipulated. Interaction with <br />HydroBase will occur using stored procedures and will utilize technology upgrades described <br />in Task 155. <br />
The URL can be used to link to this page
Your browser does not support the video tag.