Laserfiche WebLink
will be the basis for identifying data gaps and developing locations for the field data collection <br />program described in Tasks 33. <br />The draft Technical Memorandum will be updated into a final Technical Memorandum after <br />adding new aquifer configuration information obtained under Tasks 35 and 36, and addressing <br />State comments on the draft Technical Memorandum. <br />The Technical Memorandum will be provided in draft final form to the State for review and <br />comment. The Consultant will incorporate the comments and recommendations from the <br />State, and provide a final Phase 1 Denver Basin Region Aquifer Configuration Report. Six <br />hard copies and one digital copy in MSWord and Adobe Acrobat PDF format will be provided <br />to the State. <br />Task 44.3 Phase 1 Lower South Platte Region Aquifer Water Level Technical <br />Memorandum <br />The Consultant will develop a submittal of approximately 10-15 pages (with additional pages <br />for maps and appendices), consisting of the historic data on aquifer water levels and their <br />analysis, as described in Tasks 38 and 44.1. The Technical Memorandum will include the <br />following: <br />- a discussion of the data sources, analysis methods, and results, <br />- a summary of the HydroBase-compatible database fields, structure and contents, <br />- an electronic HydroBase-compatible version of the aquifer water level database, <br />- aquifer water level maps <br />Six hard copies and one digital copy (in MSWord and Adobe Acrobat PDF format) of a draft <br />Technical Memorandum will be provided to the State. This draft Technical Memorandum <br />will be the basis for identifying data gaps and developing locations for the field data collection <br />program described in Tasks 33. <br />The draft Technical Memorandum will be updated into a final Technical Memorandum after <br />adding new aquifer configuration information obtained under Task 35, and addressing State <br />comments on the draft Technical Memorandum. <br />The Technical Memorandum will be provided in draft final form to the State for review and <br />comment. The Consultant will incorporate the comments and recommendations from the <br />State, and provide a final Phase 1 Lower South Platte Region Aquifer Configuration Report. <br />Six hard copies and one digital copy in MSWord and Adobe Acrobat PDF format will be <br />provided to the State. <br />Task 33 Field Study Workplan Development: <br />Objective: <br />The objective of this task is to develop a Phase 1 field program and workplan. This field <br />program will fill some of the data gaps identified under Tasks 31/42, 32/43 and 38/44. It will <br />SPDSS Groundwater SOW, Phase 1 Page 10 <br />