My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SPDSS_GWScope4_20060915
CWCB
>
Decision Support Systems
>
DayForward
>
SPDSS_GWScope4_20060915
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/26/2011 8:53:06 AM
Creation date
7/17/2008 10:26:55 AM
Metadata
Fields
Template:
Decision Support Systems
Title
SPDSS Phase 4 - Ground Water Component
Description
Scope of Work for the ground water component of the South Platte Decision Support System (SPDSS).
Decision Support - Doc Type
Scope of Work
Date
9/15/2006
DSS Category
Groundwater
DSS
South Platte
Basin
South Platte
Contract/PO #
C153953
Bill Number
SB01-157, HB02-1152, SB03-110, HB04-1221, SB05-084, HB06-1313, SB07-122
Prepared By
CWCB
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
25
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />appendices, along with model input and output files in machine readable format. A draft will <br />be presented to the State for review and comment. After resolution of comments, this report <br />will be presented to the PRC for review and comments. <br />• It is anticipated that the draft TM for this task will be submitted to the State approximately 12 <br />months after State approval of the Phase 3 model and that the final TM will be ready <br />approximately 14 months after State approval of the Phase 3 model. <br />• All model input, output, and processes required to duplicate the URF development will be <br />documented and provided in digital format to the State in a format suitable for posting on the <br />CDSS web site. <br />Task 48.5 Compare URFs to SDFs <br />• This task will compare the URFs generated from Task 48.4 to existing Stream Depletion <br />Factors (SDFs) as provided in the CWCB reports by Hurr, Schneider and others from the <br />1972-1973 time period. Model simulations from Task 48.4 for various stream reaches will be <br />summed and transformed into equivalent SDF units so a direct comparison can be made with <br />the SDFs..Model results will be presented graphically and overlain onto maps showing SDFs. <br />Deliverable: <br />• ATM will be prepared that describes the methods used to transform the URFs into SDF- <br />equivalent units, and discusses the differences between the URFs and SDFs. It is anticipated <br />this TM will be up to 5 pages in length, with additional pages for data tables and figures. The <br />comparison of results will be presented in hard-copy and electronic (ArcGIS or equivalent} <br />formats on a suitable base map of the alluvial aquifer study area. <br />• The consultant will provide a digital copy (in both Microsoft Word and Adobe Acrobat <br />format) for review and comment by the State. The consultant will incorporate the State's <br />comments and recommendations and provide a final TM, also in digital (Microsoft Word and <br />Adobe Acrobat) format. The shapefile or raster data sets created to represent the data in the <br />TM figures will be provided and will include supporting metadata descriptions. <br />• It is anticipated that the draft TM for this task (4$.5) will be submitted to the State <br />approximately 14 months after State approval of the Phase 3 model and that the final TM will <br />be ready approximately 15 months after State approval of the Phase 3 model. <br />• All model input, output, and processes required to compare URF's to SDFs will be <br />documented and provided in digital format to the State in a format suitable for posting on the <br />CDSS web site. <br />SPDSS_Phase4_gw_SOW_09-15-06.doc 15 <br />
The URL can be used to link to this page
Your browser does not support the video tag.