Laserfiche WebLink
~~ (-~ <br />~ Implement the incorporation of historic aquifer configuration data for the Denver Basin <br />bedrock aquifer in to the new HydroBase template. <br />Deliverables: <br />Task 43.4 Phase 2 deliverables for Tasks 43.2 and 43.3. <br />Task 44: Analysis and Mapping of Water Level Data <br />Objective: <br />This task will analyze and map. the aquifer water level data collected in Phase 3 and enhance the <br />Task 44 activities undertaken in previous phases of the project. The results of this task will help <br />satisfy the SB 96-74 recommendations by expanding the groundwater level measurement <br />database for the Denver Basin Region and Lower South Platte Region aquifers. <br />Approach: <br />Task 44.1 Analyze and Map Aquifer Water Level Data <br />• This task is a continuation of the Phase 2 effort; it allows the additional data collected during <br />Phase 3 to be analyzed, mapped and included in HydroBase. The Consultant will review <br />additional. data that becomes publicly available subsequent to the Phase 2 water level program <br />for the study area and include data that the Consultant determines to be beneficial for the <br />SPDSS. These data will be converted to an electronic format,appropriatefor incorporation <br />into HydroBase. <br />• Water level data collected under Tasks 34, 39 and 40 during Phase 3 also will be converted to <br />an electronic. format appropriate for incorporation into HydroBase. <br />• Digital contour or point plot maps developed will be updated with Phase 3 data. This includes <br />maps of (a) water level elevations for the current year and (b) hydrographs. The water level <br />elevation maps will include the location of Phase 3 data used in the contouring. Contour maps <br />will be prepared where sufficient data exist to reliably develop contours, while sparse or <br />highly variable data will be presented on point plot maps. The maps will be evaluated and <br />revised based on the presence of outliers, comparison to existing contour maps, and <br />Consultant's professional judgment. <br />Deliverables: <br />Task 44.2 Phase 3 Water Level Technical Memorandum <br />SPDSS Groundwater SOW, Phase 3 12 <br />