My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CDSS_2003_Annual_Report
CWCB
>
Decision Support Systems
>
DayForward
>
CDSS_2003_Annual_Report
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/14/2011 10:16:13 AM
Creation date
7/16/2008 3:25:38 PM
Metadata
Fields
Template:
Decision Support Systems
Title
CDSS 2003 Annual Report
Description
A recap of the work done for and by the Colorado Decision Support Systems.
Decision Support - Doc Type
Publication
Date
2/1/2004
DSS
All
Basin
Statewide
Prepared By
CWCB
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
basin water resource planning model. The request 2004 Goals <br />for proposals will be sent out in early 2004 to hire a <br />This coming year will be devoted to maintaining the <br />contractor to do this work. <br />existing CDSS, continuing wi th the first phase of <br />The task of obtaining 2000 irrigated acreage data <br />the South Platte data collection effort, and <br />was completed in 2003. The information was loaded <br />completing the Rio Grande groundwater model. <br />into HydroBase and the GI S coverages are available <br />over the Web. ( http://cdss.state.co.us/ftp/gis.asp ) <br />Creation of the CDSS s ub-section, under the Water <br />Supply Protection Section, is planned for early <br />South Platte River Basin <br />Extensive data <br />collection was done <br />in 2003, and several <br />task memoranda <br />were completed and <br />are available on the <br />Web. Several test <br />wells were drilled to <br />obtain aquifer <br />properties within the <br />South Platte <br />alluvium and <br />Denver Basin <br />Aquifer. <br />We have had <br />success in obtaining <br />cooperative <br />agreements with <br />farmers to conduct <br />well pump tests and <br />collect water level <br />data. We also had a <br />coop <br />erative <br />agreement with the <br />USGS for the drilling and testing of several wells. <br />2004. This section will be headed by the Program <br />This provided a cost savings to SPDSS and <br />Coordinator and will incl ude a GIS specialist, a <br />provided the USGS with data they were not <br />water resource modeler and a database/imaging <br />otherwise able to obtain. <br />coordinator. The purpose of this group is to continue <br />The irrigated mapping was completed, with the GIS <br />to support the CDSS efforts, and will also provide <br />contractor now meeting with local water users to <br />support to the agency as a whole in the use of CDSS <br />define ditch service areas. <br />tools and components. <br />The consumptive use contractor has been meeting <br />with water commissioners to better understand the <br />administration of the river in their particular water <br />districts. <br />
The URL can be used to link to this page
Your browser does not support the video tag.