My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CDSS_2001_Annual_Preport
CWCB
>
Decision Support Systems
>
DayForward
>
CDSS_2001_Annual_Preport
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/14/2011 10:16:13 AM
Creation date
7/16/2008 3:22:20 PM
Metadata
Fields
Template:
Decision Support Systems
Title
CDSS 2001 Annual Report
Description
A recap of the work done for and by the Colorado Decision Support Systems.
Decision Support - Doc Type
Publication
Date
1/1/2002
DSS
All
Basin
Statewide
Prepared By
CWCB
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Operation and Maintenance (O&M) <br />The pie chart illustrates the amount that has been <br />Since the initiation of the CDSS effort for the <br />used for development of the CRDSS and RGDSS <br />Colorado River Basin, funding of the operation and <br />compared to the existing operation and maintenance <br />maintenance of the CRDSS and RGDSS efforts has <br />fund, which is approximately five percent. <br />been an issue. Currently, approximately $621,000 per <br />year has been funded to protect the current capital <br />investment of $13 million dollars. Sixty percent of <br />Percent Comparison between Existing CDSS <br />the $621,000 is associated with FTEs, and the <br />development and Existing O & M <br />remaining 40 percent is used for <br />hardware/networking costs. This amount was <br />5% <br />intended as partial O&M funding for the Colorado <br />Existing Operation <br />and Rio Grande basins and does not include any <br />and Maintenance <br />funding for any future DSS development. <br />This current O&M funding is not adequate to fund <br />the operation and maintenance of future CDSS <br />components and is inadequate to fund full-scale <br />maintenance of the existing system. <br />The CWCB, with the support of DWR, prepared a <br />Targeted Base Review for the Office of State <br />Planning and Budge that detailed the current and <br />long-term maintenance requirements of the CDSS <br />Development <br /> Development <br />system. As a result of that study, a Decision Item that <br />requests an additional $376,404 annually and a one- <br />time capital outlay of $7,200 from Severance Tax to <br />support a long-term strategy for operating and <br />maintaining the existing Colorado’s Decision Support <br />95% <br />Systems (CDSS). This decision item requests three <br />FTEs, a program coordinator, a groundwater modeler <br />The current funding provides mostly for operation <br />and a GIS Specialist along with monies for contract <br />personnel and provides minimal support for regular <br />work associated with specialized work tasks. CDSS <br />maintenance of the CDSS. CDSS operation and <br />includes the existing Colorado River basin system <br />maintenance should be considered part of the <br />and the Rio Grande basin system that will become <br />construction process since it provides essential tools <br />fully operational in FY2001-02. <br />for needed determining the feasibility of constructing <br />a water project. <br />Capital funding for the construction of additional <br />decision support systems for the other river basins in <br />For more detailed discussion on CDSS as well as <br />the state is expected to continue to be provided from <br />component fact sheets, please go to the CDSS <br />the CWCB construction bill. A specified amount of <br />. <br />website at http://cdss.state.co.us <br />existing O&M funds has also been and will continue <br />to be provided by the CWCB construction fund. <br />
The URL can be used to link to this page
Your browser does not support the video tag.