My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Gunnison_BasinReport_200407
CWCB
>
Decision Support Systems
>
DayForward
>
Gunnison_BasinReport_200407
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/26/2011 8:33:25 AM
Creation date
7/15/2008 8:55:15 AM
Metadata
Fields
Template:
Decision Support Systems
Title
Gunnison River Basin Information
Description
General information regarding surface water projects and operations within the Gunnison River basin.
Decision Support - Doc Type
Basin Report
Date
7/1/2004
DSS Category
Surface Water
DSS
Colorado River
Basin
Gunnison
Contract/PO #
C153933, C154062
Grant Type
Non-Reimbursable
Bill Number
SB92-87, HB93-1273, SB94-029, HB95-1155, SB96-153, HB97-008
Prepared By
Leonard Rice Engineering
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
73
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
credits created under this agreement are canceled on October 31 of each year (this <br />statement was stricken from an amendment to the agreement in 1979 for the purpose <br />of allowing "for a more normal operation of Taylor Park Reservoir releases based <br />upon the historical operations of the reservoir by the UVWUA"). <br />• When Taylor Park Reservoir spills and the United States has credits in the reservoir, <br />then the first water spilled is charged against the credits of the United States. <br />UVWUA's credits in the Aspinall reservoirs, when added to the UVWUA's water <br />stored in Taylor Park Reservoir, cannot exceed the active capacity of Taylor Park <br />Reservoir (106,230 acre-feet). <br />Reference is made to the following agreements and decrees concerning the operation of <br />the Taylor ParkBlue Mesa Exchange Agreement: <br />• August 21, 1972, contract agreement between the United States and the UVWUA. <br />• August 28, 1975, contract agreement between the United States, the UVWUA, the <br />Upper Gunnison River Water Conservancy District, and the Colorado River Water <br />Conservation District. <br />• April 16, 1990, contract agreement between the United States, the UVWUA, the <br />Upper Gunnison River Water Conservancy District, and the Colorado River Water <br />Conservation District. This agreement amended some of the terms of the 1975 <br />agreement. <br />• The final Water Court decree in Case No. 86CW203 concerning the application of the <br />Upper Gunnison River Water Conservancy District for the right to refill Taylor Park <br />Reservoir. This document provides a comprehensive history and interpretation of the <br />reservoir operations and agreements. <br />The managed operation of the storage in Taylor Park Reservoir pursuant to the 1975 <br />exchange agreement has resulted in significant fishery benefits. Releases within the flow <br />ranges shown in the table below have been beneficial for fishery conditions and <br />recreational uses in the Taylor and Gunnison Rivers downstream from Taylor Park <br />Reservoir (Case No. 86CW203, paragraph 22). <br />Gunnison River Basin Information 2-14 <br />
The URL can be used to link to this page
Your browser does not support the video tag.