My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Gunnison_BasinReport_200407
CWCB
>
Decision Support Systems
>
DayForward
>
Gunnison_BasinReport_200407
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/26/2011 8:33:25 AM
Creation date
7/15/2008 8:55:15 AM
Metadata
Fields
Template:
Decision Support Systems
Title
Gunnison River Basin Information
Description
General information regarding surface water projects and operations within the Gunnison River basin.
Decision Support - Doc Type
Basin Report
Date
7/1/2004
DSS Category
Surface Water
DSS
Colorado River
Basin
Gunnison
Contract/PO #
C153933, C154062
Grant Type
Non-Reimbursable
Bill Number
SB92-87, HB93-1273, SB94-029, HB95-1155, SB96-153, HB97-008
Prepared By
Leonard Rice Engineering
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
73
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Taylor Park Reservoir Water Rights <br />Structure Structure Appropriation Administration Decreed Amount (acre-feet) <br />Name ID Date Number Absolute Conditional <br />Taylor Park 8/03/1904 30667.19938 111,260 <br />Reservoir 3666 <br />8/28/1975 <br />49673.45895 <br />44,700 61,530 <br />The Upper Gunnison River Conservancy District obtained a decree in Case No. <br />86CW203 for the right to refill Taylor Park Reservoir for a total amount of 106,230 acre- <br />feet with the appropriation date of August 28, 1975. Water is typically stored pursuant to <br />the refill decree after the UVWUA has satisfied its annual fill on the senior storage right. <br />The following summarizes the adjudication of the refill decree. <br />Taylor Park Reservoir Refill Decrees <br />Use Absolute Conditional Total <br />Irrigation 13,777 5,423 19,200 <br />Fish and Recreation 30,923 56,107 87,030 <br />Total 44,700 61,530 106,230 <br />2.4.2. General Operation of Taylor Park Reservoir <br />In order to fill Taylor Park Reservoir without spilling, releases during the winter and <br />spring months are based, in part, on forecasts provided by the USBR. Annually, the <br />various Taylor Park water users reach agreement regarding a summer release schedule <br />that will provide a stable flow hydrograph below the reservoir for improved recreational <br />and fishery purposes. As part of this release program, the users have adopted an <br />objective of having approximately 90,000 acre-feet of stored water in Taylor Park <br />Reservoir by late August. Because of this practice, the one annual fill of the UVWUA's <br />senior storage right is generally achieved by early December. <br />The following tables provide a summary of the physical features of Taylor Park <br />Reservoir. <br />Taylor Park Reservoir Physical Features <br />Features <br />Capacity <br />Outlet Works Capacity <br />Total Capacity <br />Active Capacity <br />Dead and Inactive Capacity <br />1,500 cfs <br />106,225 ac-ft <br />15 ac-ft <br />106,210 ac-ft <br />Gunnison River Basin Information 2-10 <br />
The URL can be used to link to this page
Your browser does not support the video tag.