My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CRDSS_Task1_15-27_CalibrationOfMODSIMPrototype
CWCB
>
Decision Support Systems
>
DayForward
>
CRDSS_Task1_15-27_CalibrationOfMODSIMPrototype
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/26/2011 8:32:33 AM
Creation date
7/11/2008 12:46:29 PM
Metadata
Fields
Template:
Decision Support Systems
Title
CRDSS Task 1.15-27 - Water Rights Planning Model - Calibation of MODSIM Prototype
Description
The purpose of this task memorandum is to describe and document the procedures used to calibrate the MODSIM computer model developed as the prototype water rights planning model (WRPM) for the Gunnison River basin.
Decision Support - Doc Type
Task Memorandum
Date
1/9/1995
DSS Category
Surface Water
DSS
Colorado River
Basin
Colorado Mainstem
Gunnison
Contract/PO #
C153658, C153727, C153752
Grant Type
Non-Reimbursable
Bill Number
SB92-87, HB93-1273, SB94-029, HB95-1155, SB96-153, HB97-008
Prepared By
Riverside Technology inc.
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
12
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
BLUE MESA, MODSIM NODE: 335 <br />SIMULATED SIMULATED PERCENT PERCENT <br />MEAN (AF) - MEAN (AF) - OBSERVED BIAS (%) - BIAS (%) - <br />MONTH MODSIM GUNMOD MEAN (AF) MODSIM GUNMOD <br /> Jan66136766195742885754.2 2 54.3 5 <br /> Feb59438259561737115060.1 5 60.4 8 <br /> Mar53691754240432583864.7 8 66.4 6 <br /> Apr51823652594931663363.6 7 66.1 1 <br /> May61827665656942397845.8 3 54.8 6 <br /> Jun82335283083062297232.1 7 33.3 7 <br /> Jul86662987315667086129.1 8 30.1 5 <br /> Aug84288187655064144731.4 0 36.6 5 <br /> Sep81952485964360347835.8 0 42.4 5 <br /> Oct79027380883159135433.6 4 36.7 8 <br /> Nov74785276185956177333.1 2 35.6 2 <br /> Dec69352271102649911438.9 5 42.4 6 <br />YEAR8513211 8704391605745540.5 4 43. 7 <br />GUNMOD Calibration Run (Version 0.99) <br />Because additional verification of the MODSIM model was required, MODSIM results were compared <br />to the calibration results obtained from the Gunni son Basin Planning Model (GUNMOD) developed by <br />Hydrosphere. The results of the GUNMOD calibration process are evaluated by comparing the results <br />from the simulated model runs at several calibration poi nts to the historic data at those locations. This <br />is accomplished by analyzing graphical plots and tabular data (previous pages) of the monthly flows <br />between simulated and historic flows for the calibration period. The graphical comparisons are <br />attached in Appendix B. <br />The calibration points used to compare the GUNMOD calibration run include all the stream gaging <br />locations used in the MODSIM calibration: Selig Canal, Ironstone Canal, Loutzenhizer Canal, Fire <br />Mountain Canal, Blue Mesa Reser voir, and Taylor Park Reservoir. <br />The simulation used for this analysis was deri ved from the CALIBRAT.RUN input data files from <br />Version 0.99. The following modifica tions were made to the CALIBRAT.RUN data set to produce the <br />simulation shown in the graphi cal comparisons in Appendix B: <br />The senior decree at Taylor Park reservoir was increased by 40,000 acre-feet, and the starting <br />? <br />contents were set to 88,900 acre-feet. <br />The Taylor River flow regime was set to 150 cf s in October, 75 cfs November through April, 100 <br />? <br />cfs in May, 150 cfs in June, 175 cfs in July, 225 cfs in August, and 200 cfs in September. <br />The minimum release from Blue Mesa was set to 300 cfs and the augmentation and replacement <br />? <br />release limits were set to "No Limit." <br />10 <br />A275 02.23.94 1.15-27 Fosha, Ritsch <br />
The URL can be used to link to this page
Your browser does not support the video tag.