My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CRDSS_Task1_15-25_UncompahgreProject
CWCB
>
Decision Support Systems
>
DayForward
>
CRDSS_Task1_15-25_UncompahgreProject
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/26/2011 8:32:33 AM
Creation date
7/11/2008 12:39:08 PM
Metadata
Fields
Template:
Decision Support Systems
Title
CRDSS Task 1.15-25 - Water Rights Planning Model - Uncompahgre Project
Description
This memorandum describes the operations of the Uncompahgre Project, which involves the irrigation of approximately 86,000 acres between Montrose and Delta.
Decision Support - Doc Type
Task Memorandum
Date
1/9/1995
DSS Category
Surface Water
DSS
Colorado River
Basin
Colorado Mainstem
Contract/PO #
C153658, C153727, C153752
Grant Type
Non-Reimbursable
Bill Number
SB92-87, HB93-1273, SB94-029, HB95-1155, SB96-153, HB97-008
Prepared By
Riverside Technology inc.
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
call up to the 245 cfs discussed above. The call would normally be in effect for a relatively short period <br />(2 to 3 weeks). <br />Taylor Park - Blue Mesa Storage Accounting <br />The release of UVWUA's storage water in Taylor Park Reservoir is subject to an operating and exchange <br />agreement between the UVWUA, the United States, and the Upper Gunnison Water Conservancy <br />District. The Taylor Park-Blue Mesa reservoir operations are discussed separately in Task Memorandum <br />1.15-19. <br />Ridgway Reservoir - Project 7 Exchange Accounting <br />The operation of UVWUA's reservoir storage accounts in Ridgway Reservoir is described separately in <br />Task Memorandum 1.15-20. <br />Operation of the Uncompahgre Project in the CRDSS Program MODSIM <br />The following discussion summarizes the key assumptions used in the CRDSS water rights planning <br />model (MODSIM) to simulate the operations of the Uncompahgre Project. <br />The required deliveries of water to the Uncompahgre Project are driven by the irrigation <br />? <br />demands under the project canals. These demands are determined using estimates of the <br />irrigated acreage, monthly values of net consumptive use, and system irrigation efficiencies. <br />For the CRDSS prototype of the Gunnison River, the acreage values used to develop the <br />Gunnison River planning model (GUNMOD) were adopted. These values were confirmed with <br />the Manager of the UVWUA and are summarized in Table 2. <br />TABLE 2 <br />ACREAGE VALUES FOR GUNMOD <br />PROJECT IRRIGATED CANAL <br />CANAL ACREAGE(ACRES) CAPACITY (CFS) <br />M & D Canal25,25055 0 <br />Loutzenhizer 6,20012 0 <br />Canal <br />Selig Canal9,96032 0 <br />Ironstone Canal22,55040 0 <br />East Canal7,67016 5 <br />Garnet Canal1,5907 5 <br />South Canal7,0201,01 0 <br />West Canal5,75017 0 <br />TOTAL85,990 <br />6 <br />A275 01.09.95 1.15-25 Fosha, Hyre <br />
The URL can be used to link to this page
Your browser does not support the video tag.