My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CRDSS_Task10-1_DataExtentionFeasibility
CWCB
>
Decision Support Systems
>
DayForward
>
CRDSS_Task10-1_DataExtentionFeasibility
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/26/2011 8:31:55 AM
Creation date
7/10/2008 3:06:50 PM
Metadata
Fields
Template:
Decision Support Systems
Title
CRDSS Task 10.1 - Data Extension Feasibility
Description
This memo covers data extension feasibility.
Decision Support - Doc Type
Task Memorandum
Date
11/1/1999
DSS Category
Surface Water
DSS
Colorado River
Basin
Colorado Mainstem
Contract/PO #
C153728
Grant Type
Non-Reimbursable
Bill Number
SB92-87, HB93-1273, SB94-029, HB95-1155, SB96-153, HB97-008
Prepared By
Boyle
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
13
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
References <br />Boyle Engineering Corporation, 1987. Final Report Joint-Use Reservoir and Green Mountain <br />Exchange Projects. Prepared for the Colorado Water Resources and Power Development <br />Authority. <br />Boyle Engineering Corporation, 1989. San Miguel Project Water Supply Study - Phase I Final <br />Report. Prepared for the Colorado Water Conservation Board. <br />Boyle Engineering Corporation, and Resource Consultants and Engineers (RCE), Inc. 1994. City <br />of Greeley, Colorado Drought Analysis and Water Supply Study. <br />CH2M Hill, 1989. Fraser River Basin Phase I -Feasibility Study Summary Report. Prepared for <br />the Colorado Water Resources and Power Development Authority. <br />Colorado Water Conservation Board (CWCB) and United States Department of Agriculture <br />(USDA), 1985. Water and Related Land Resources Colorado River Basin in Colorado. <br />HDR Engineering, Inc., 1989. Upper Gunnison-Uncompahgre Basin Phase I -Feasibility Study <br />Final Report. Prepared for the Colorado Water Resources and Power Development Authority. <br />Harding, B.L., T.B. Sangoyomi, and E.A. Payton, 1995. "Impacts of a Severe Sustained Drought <br />on Colorado River Water Resources." Water Resources Bulletin, American Water Resources <br />Association Vol. 31, No. 5, 815-824. <br />Harza Engineering Company, and consultants (Leonard Rice Consulting Water Engineers, Brown, <br />Bortz & Coddinton, Tom Pitts & Associates, Morton W. Bittinger, and PE & LS), 1987. Final <br />Report, Cache la Poudre Basin Water and Hydropower Resources Management Study. <br />Hydrosphere Resource Consultants and Muller Engineering Company, Inc., 1993. Final Report <br />Yampa River Basin Alternatives Feasibility Study. <br />Hydrosphere Resource Consultants (HRC), 1995. Yampa River Basin Recommended Alternative, <br />Detailed Feasibility Study Final Report. <br />Keller-Bliesner Engineering, 1997. Extension of Natural Flow Records Using Spatial <br />Disaggregation. <br />Leonard Rice Consulting Water Engineers, Inc., 1990. Final Report, Rio Grande Water Supply <br />Study -Phase I. Denver, Colorado. <br />Nash, L.L., P.H. Gleick, 1993. "The Colorado River Basin and Climatic Change, Sensitivity of <br />Streamflow and Water Supply to Variations in Temperature and Precipitation." Pacific Institute for <br />Studies in Development, Environment, and Security, Oakland, California. <br />Appendix E E-6 <br />
The URL can be used to link to this page
Your browser does not support the video tag.