My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SPDSS_Task5_KeyStructure_WaterSupplyStorageCo
CWCB
>
Decision Support Systems
>
DayForward
>
SPDSS_Task5_KeyStructure_WaterSupplyStorageCo
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/26/2011 8:52:20 AM
Creation date
7/10/2008 9:22:14 AM
Metadata
Fields
Template:
Decision Support Systems
Title
SPDSS Task 5 - Key Structure, Water Supply and Storage Company
Description
The Water Supply and Storage Company has been identified as a key structure for the South Platte Decision Support System (SPDSS) consumptive use and surface water modeling efforts. The purpose of this Task 5 memorandum is to document physical, legal, and operational aspects of those key structures identified.
Decision Support - Doc Type
Task Memorandum
Date
3/5/2005
DSS Category
Surface Water
DSS
South Platte
Basin
South Platte
Contract/PO #
C153954
Grant Type
Non-Reimbursable
Bill Number
SB01-157, HB02-1152, SB03-110, HB04-1221, SB05-084, HB06-1313, SB07-122
Prepared By
Leonard Rice Engineering
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
21
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Where to find more information <br />^ Procedures for determining key diversion structures and a list of all key diversion structures <br />selected is presented in SPDSS Task 3 -Identify Key Diversion Structures Overall <br />Task Memorandum. <br />^ Procedures for determining key reservoirs and reservoir systems and a list of all key <br />reservoirs and reservoir systems structures selected is presented in SPDSS Task 5 - <br />Identify Key Storage Elements Overall Task Memorandum. <br />^ Additional information on ditch and reservoir operations within the Water District is <br />presented in the SPDSS Task 3 -Water District 3 Meeting Notes. <br />^ Additional information on WSSC exchanges and agreements can be found in other SPDSS <br />Task 5 Operating Memoranda including: North Poudre Irrigating Company, Larimer and <br />Weld Irrigation Company, and New Cache la Poudre Irrigation Company. <br />^ Structure specific memos have been prepared for WSSC transmountain diversions, <br />including Laramie Poudre Tunnel, Skyline Ditch, Cameron Pass Ditch, and Grand River <br />Ditch, as part of SPDSS Task 4 -Identify Key Transmountain Diversion Structures. <br />^ Additional information on C-BT operations within Water District 3 is presented in SPDSS <br />Task 5- Northern Colorado Water Conservancy District and the Colorado-Big <br />Thompson Project Memorandum. <br />REFERENCES <br />1) Colorado Water Resources and Power Development Authority. Cache la Poudre Basin <br />Water and Hydropower Resources Management Study. Denver, Colorado. January 1987. <br />2) Rocky Mountain Consultants, Inc. Engineering Documentation for Change of Use of the <br />City of Thornton's Shares in the Water Supply and Storage Company and,Iackson Ditch <br />Company 87CW332. Longmont, Colorado. March 1990. <br />3) Water Rights Data. Colorado Division of Water Resources. http://water.state.co.us/ <br />4) Wright-McLaughlin Engineers and Woodward-Clyde & Associates. Long Draw Reservoir <br />Enlargement Project of the Water Supply and Storage Company. Denver, Colorado. June <br />1968. <br />5) Wright Water Engineers. Report on Water Supply and Storage Company Yield of Water <br />Rights and Comparative Value of Colorado -Big Thompson Units. Denver, Colorado. <br />September 1964. <br />WaterSupply&Storage Memo.doc <br />20 of 21 <br />
The URL can be used to link to this page
Your browser does not support the video tag.