My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SPDSS_Task5_KeyStructure_NorthPoudre
CWCB
>
Decision Support Systems
>
DayForward
>
SPDSS_Task5_KeyStructure_NorthPoudre
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/26/2011 8:52:20 AM
Creation date
7/9/2008 3:40:23 PM
Metadata
Fields
Template:
Decision Support Systems
Title
SPDSS Task 5 - Key Structure, North Poudre Irrigation Company
Description
The North Poudre Irrigation Company has been identified as a key structure for the South Platte Decision Support System (SPDSS) consumptive use and surface water modeling efforts. The purpose of this Task 5 memorandum is to document physical, legal, and operational aspects of those key structures identified.
Decision Support - Doc Type
Task Memorandum
Date
3/5/2005
DSS Category
Surface Water
DSS
South Platte
Basin
South Platte
Contract/PO #
C153954
Grant Type
Non-Reimbursable
Bill Number
SB01-157, HB02-1152, SB03-110, HB04-1221, SB05-084, HB06-1313, SB07-122
Prepared By
Leonard Rice Engineering
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
29
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
As shown on Figure 2, Halligan Reservoir fills in most years. However, during periods of <br />drought, such as the early- to mid-1950's, the mid-1970's and 2000 through 2002, Halligan <br />Reservoir did not fill to maximum capacity. Recreational use surface rights to Halligan <br />Reservoir are leased to neighboring landowners. As such, since the mid-1980's Halligan <br />Reservoir has not been emptied during the winter for the benefit of the leasee. <br />2) North Poudre Canal (Structure ID 0300994) <br />North Poudre Canal is considered part of the North <br />End Division of the NPIC System. The North <br />Poudre Canal is comprised of the Livermore Lateral, <br />No. 15 Bypass, Buckeye Lateral, Boxelder Lateral, <br />and numerous smaller laterals off the main laterals, <br />as shown on Figure 1. <br />'~:~; <br />~~ ~ .:.~ <br />.~,: ~ <br />The North Poudre Canal headgate is located on the ~ ~~ ~'~ ~ ~ ~ . __ <br />north side of the North Fork Cache la Poudre River. ~~"' °~° ~ '~° '- <br />The canal is carried through a tunnel for North Poudre canal near diversion in Poudre <br />approximately one-mile before it is discharged into river ax the mouth of the canyon <br />an open, earth-lined canal. The Livermore Lateral <br />component of the North Poudre Canal delivers water to Park Creek Reservoir. Below Park <br />Creek Reservoir, the canal splits into the No. 15 Bypass and the Buckeye Lateral. The Buckeye <br />Lateral is the main extension of the canal. South of North Poudre Reservoir No. 15, the No. 15 <br />Bypass intersects the Main North Poudre Supply Canal. The Buckeye Lateral continues east to <br />the town of Buckeye, at which point it becomes the Boxelder Lateral. The Boxelder Lateral <br />travels generally south from Buckeye to a point where it intersects the Main North Poudre <br />.;., <br />~, <br />~~- . <br />NorthPoudreMemo.doc 9 of 29 <br />Figure 2: Halligan Reservoir End of Month Storage Contents <br />
The URL can be used to link to this page
Your browser does not support the video tag.