Laserfiche WebLink
of the C-BT Project will be included in the SPDSS effort will be made during the future surface <br />water modeling effort. <br />The key C-BT Project structures in the eastern slope distribution system located within the <br />SPDSS study area are as follows: <br />1) Alva B. Adams Tunnel and upper portion of East Slope Distribution System <br />o East Portal Reservoir <br />o Mary's Lake <br />o Lake Estes <br />o Foothills System <br />o Dille Tunnel <br />o Pinewood Reservoir <br />o Flatiron Reservoir <br />2) Carter Lake, <br />o Saint Vrain Supply Canal, <br />o Charles Hansen Feeder Canal, and <br />o Southern Water Supply Pipeline. <br />3) Horsetooth Reservoir, <br />o Charles Hansen Supply Canal, and <br />o Pleasant Valley Pipeline. <br />The boundaries of the NCWCD and Subdistrict and the West Slope Collection and East Slope <br />Distribution systems are shown on Figure 1. <br />3of17 <br />