My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SPDSS_Task5_KeyStructure_GreeleyLovelandIrrigCo
CWCB
>
Decision Support Systems
>
DayForward
>
SPDSS_Task5_KeyStructure_GreeleyLovelandIrrigCo
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/26/2011 8:37:05 AM
Creation date
7/9/2008 1:28:17 PM
Metadata
Fields
Template:
Decision Support Systems
Title
SPDSS Task 5 - Key Structure, Greeley Loveland Irrigation Company
Description
The Greeley Loveland Irrigation Company has been identified as a key structure for the South Platte Decision Support System (SPDSS) consumptive use and surface water modeling efforts. The purpose of this Task 5 memorandum is to document physical, legal, and operational aspects of those key structures identified.
Decision Support - Doc Type
Task Memorandum
Date
1/5/2005
DSS Category
Surface Water
DSS
South Platte
Basin
South Platte
Contract/PO #
C153954
Grant Type
Non-Reimbursable
Bill Number
SB01-157, HB02-1152, SB03-110, HB04-1221, SB05-084, HB06-1313, SB07-122
Prepared By
Leonard Rice Engineering
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
18
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
shareholders down ditch and into the City of Greeley's water treatment plant located on the west <br />side of Boyd Lake (see Operational Information section). <br />Capacity: <br />Total Storage: 12,736 ac-ft <br />Active Storage: 12,086 ac-ft <br />Dead Storage: 650 ac-ft <br />Inlet Ditch Capacity: The Lake Loveland inlet structure is abroad-crested spillway that can <br />handle greater than the 700 cfs conveyance capacity of the Big Barnes Ditch. <br />Elevation Capacity Data: An elevation-capacity curve for the reservoir was provided by the <br />GLIC. A subset of points from the curve is provided in Table 1. <br />Table 1 <br />Lake Loveland <br />Stage -Area -Capacity Curve <br />Elev. Area Capacity <br />(ft) (Acres) (Ac-Ft) <br />0 NA 0.0 <br />3 NA 474.5 <br />6 NA 1054.0 <br />9 NA 1711.2 <br />12 NA 2433.3 <br />15 NA 3214.0 <br />18 NA 4046.0 <br />21 NA 4930.4 <br />Elev. Area Capacity <br />(ft) (Acres) (Ac-Ft) <br />24 NA 5870.0 <br />27 NA 6871.2 <br />30 NA 7956.8 <br />33 NA 9141.4 <br />36 NA 10411.0 <br />39 NA 11772.4 <br />41 540 12736.0 <br />Source: GLIC. Resurvey January 31, 1951. <br />Notes: Dead storage of 650 ac-ft (elevation 4.0 feet). <br />NA -not available. <br />Enlargement History: Lake Loveland has not been enlarged. <br />Reservoir Storage Measurement: Storage levels in Lake Loveland are measured using a <br />stainless steel slope gage located on the dam. The superintendent for the ditch company is <br />responsible for collecting and reporting the end-of--month storage amount to the Water <br />Commissioner in Water District 4. <br />Horseshoe Lake (Structure ID 0404123) <br />Horseshoe Lake and the other lakes that make up the Seven Lakes Company were constructed in <br />the early 1900s along the natural drainage of Dry Creek to the north and east of Lake Loveland. <br />Lacking filler ditches to deliver river water to its lakes, the Seven Lakes Company negotiated <br />Greeley Loveland Irrigation Company Operating Memorandum.doc 8 of 18 January 5, 2005 <br />
The URL can be used to link to this page
Your browser does not support the video tag.