My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SPDSS_Task5_KeyMuniUser_FtCollins
CWCB
>
Decision Support Systems
>
DayForward
>
SPDSS_Task5_KeyMuniUser_FtCollins
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/26/2011 8:37:06 AM
Creation date
7/9/2008 12:55:03 PM
Metadata
Fields
Template:
Decision Support Systems
Title
SPDSS Task 5 - Key Municipal User, City of Fort Collins
Description
The City of Fort Collins has been identified as a key municipal user for the South Platte Decision Support System (SPDSS) consumptive use and surface water modeling efforts. The purpose of this Task 5 memorandum is to document physical, legal, and operational aspects of those key structures identified.
Decision Support - Doc Type
Task Memorandum
Date
2/5/2005
DSS Category
Surface Water
DSS
South Platte
Basin
South Platte
Contract/PO #
C153954
Grant Type
Non-Reimbursable
Bill Number
SB01-157, HB02-1152, SB03-110, HB04-1221, SB05-084, HB06-1313, SB07-122
Prepared By
Leonard Rice Engineering
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
20
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
satisfied by releases from Horsetooth Reservoir. The City's direct flow rights at the Fort Collins <br />Pipeline and the changed irrigation water rights are sufficient to meet much of the potable water <br />demands during the summer (April-October). <br />Other supplies available to the City come from the use of its Windy Gap supplies and its changed <br />water rights. Reusable supplies from the City's wastewater treatment plants that are not used by <br />PRPA can sometimes be exchanged upstream to the Fort Collins Pipeline, PVP Pipeline (North <br />Poudre Supply Canal headgate), Joe Wright Reservoir, or other locations. <br />Where to find more information <br />^ Procedures for determining key diversion structures and a list of all key diversion structures <br />selected is presented in SPDSS Task 3 -Identify Key Diversion Structures Overall Task <br />Memorandum. <br />^ Procedures for determining key reservoirs and reservoir systems and a list of all key <br />reservoirs and reservoir systems structures selected is presented in SPDSS Task 5 - <br />Identify Key Storage Elements Overall Task Memorandum. <br />^ Additional information on ditch and reservoir operations within the Water District is <br />presented in the SPDSS Task 3 -Water District 5 Meeting Notes. <br />^ Additional information on NCWCD, Carter Lake, St. Vrain Supply Canal, and C-BT <br />operations within the Water District is presented in SPDSS Task 5-Northern Colorado <br />Water Conservancy District and the Colorado-Big Thompson Project Memorandum. <br />^ Additional information on NPIC and Halligan Reservoir is presented in SPDSS Task 5 - <br />Key Structure, North Poudre Irrigation Company Memorandum. <br />^ Additional information on WSSC, Chambers Lake, and Long Draw Reservoir is presented <br />in the SPDSS Task 5 Memorandum -Key Structure, Water Supply and Storage <br />Company Memorandum. <br />REFERENCES <br />1) Meeting with Water Division 1, Water District 3 Commissioner George Varra. <br />970.484.1628. <br />2) Meeting with City of Fort Collins representatives: Dennis Bode, Donnie Dustin. <br />September 3, 2004. <br />3) Water Supply & Demand Management Policy Report, City of Fort Collins Utilities, May <br />2004. <br />City of Fort Collins Operating Memorandum.doc 19 of 20 January 5, 2005 <br />
The URL can be used to link to this page
Your browser does not support the video tag.