of severe and protracted drought, as determined by the state and approved by the District
<br />Engineer, when the reservoir may be allowed to fall below elevation 5423.0 feet msl."
<br />The river control gates located in the control tower of the dam are operated by the COE. When
<br />the reservoir elevation is within the conservation pool, storage releases are determined by the
<br />SEO. When the reservoir elevation is in the flood control or surcharge zone (elevations greater
<br />than 5,432 feet msl), storage and releases are determined by the COE. The COE attempts to limit
<br />the releases so the flow of the South Platte River at the Denver Gage remains less than 5,000 cfs.
<br />The SEO is consulted to ensure that the flow is sufficient to meet downstream demands and is
<br />advised of contemplated releases.
<br />Chatfield Reservoir is an administrative control point on the river for water supplies owned and
<br />used by numerous municipalities with water right interests in Water District 8 and upstream. The
<br />Chatfield Check-Sheet was established in the early-1980s and is used by Water Commissioner
<br />Bob Stahl to account daily how much flow needs to be released from Chatfield Reservoir for
<br />delivery of downstream water rights and natural streamflow conditions. See SPDSS Task 3
<br />Water District 8 Meeting Notes memorandum for more information.
<br />Specifics regarding Chatfield Reservoir include:
<br />• 206,779 ac-ft total flood pool
<br />• Operational surface area of 1,429 acres
<br />• Operational capacity of 27,428 ac-ft
<br />• 7,035 ac-ft minimum pool with 6,692 ac-ft dead storage (13,068 ac-ft active storage capacity)
<br />• Outlet capacity is not limiting and seepage losses from Chatfield Reservoir are minimal
<br />An elevation-area-capacity table for provided by Denver Water is summarized in Table 8.
<br />Table 8
<br />Elevation-Area-Capacity Data
<br />Chatfield Reservoir
<br />Elevation Area (acres) Capacity
<br />(feet msl) (ac-ft)
<br />5380 0 0
<br />5385 12 23
<br />5390 44 135
<br />5395 135 508
<br />5400 275 1,531
<br />5405 437 3,278
<br />5410 589 5,893
<br />5415 743 9,166
<br />5420 929 13,338
<br />5423 1,044 16,294
<br />5425 1,131 18,468
<br />5430 1,344 24,656
<br />5432 1,429 27,428
<br />5435 1,572 31,925
<br />5440 1,818 40,392
<br />5445 2,049 50,096
<br />5450 2,282 60,889
<br />Elevation Area (acres) Capacity
<br />(feet msl) (ac-ft)
<br />5455 2,528 72,924
<br />5460 2,754 86,154
<br />5465 2,972 100,456
<br />5470 3,198 115,878
<br />5475 3,439 132,443
<br />5480 3,678 150,266
<br />5485 3,906 169,213
<br />5490 4,179 189,356
<br />5495 4,486 211,027
<br />5500 4,780 234,207
<br />5505 5,056 258,814
<br />5510 5,347 284,776
<br />5515 5,640 312,278
<br />5520 5,907 341,151
<br />5525 6,180 371,356
<br />5529.5 6,431 399,739
<br />5530 --- 402,891