Laserfiche WebLink
NTM CWCB Water Conservation Plan Grant Application Page 7 of 11 <br />treatment plant is designed to easily expand to 11 MGD. During the District's busiest <br />periods, current use does not exceed 5.9 MGD. Five treated water storage tanks are <br />located throughout the service area, ranging in size from 0.5 to 2.5 million gallons. <br />Water is delivered throughout NTM's service area by 78.7 miles of water mains. <br />In 2006 NTM diverted the largest volume in its history for a total of 2,800 acre-feet, just <br />under half of its entitlement. Atpre-drought (2000) per capita water use levels, the 100% <br />build out scenario (all developable acreage at 3 houses per acre and 2.62 people per <br />household) would translate into a total annual water demand of over 9,000 of per year. <br />Assuming full use of the 6,000 of from Denver, this would require an additional 3,000 of <br />from other water supplies. Even assuming 2006 per capita water use rates, at build out <br />NTM would require an additional 1,400 of of additional supply annually. As the number <br />of residents in Colorado and along the Front Range grows, new water supplies are <br />increasingly difficult and expensive to acquire. NTM recognizes that it must include <br />water conservation as an essential tool in managing current and future demands. <br />Waste Water Treatment and Storage <br />NTM contracts with Metro Wastewater for all wastewater treatment. NTM is responsible <br />for wastewater lines and pump stations required to deliver waste to Metro's system. As <br />NTM's service area continues to grow, so will the need for new and expanded wastewater <br />conveyance Ines. <br />6. Description of the project plan: <br />North Table Mountain Water and Sanitation District proposes to develop a Water <br />Conservation Plan using the CWCB's "Water Conservation Plan Development Guidance <br />Document" as a guide. NTM may adjust sections and worksheets as necessary to <br />represent its specific circumstances. NTM's Water Conservation Plan will be designed to <br />meet the requirements of House Bills 91-1154 and 04-1365 . <br />NTM will provide project oversight and proposes to hire Hydrosphere Resource <br />Consultants to assist in the development of the Water Conservation Plan. Hydrosphere <br />has experience working with the CWCB's guidance document and in writing plans that <br />meet and exceed State requirements. Table 5 below includes a detailed description of <br />work to be performed under each Project task including responsibilities, deliverables and <br />milestones. Attachment C provides additional details regarding the roles of specific <br />NTM and Hydrosphere prof ect team members. Table 6 is a proposed Proj ect schedule <br />including progress reports to the CWCB. Attachment F is the Project budget, including a <br />breakdown of hours by organization and staff member for each task. Funding sources are <br />listed in Table 7. <br />All tasks generally follow the CWCB guidance document unless otherwise noted. The <br />level of analysis undertaken in any specific task will depend on the availability of <br />existing information. Extensive new research or financial and/or planning analyses that <br />would be more appropriately addressed in a Master Plan will not be completed under this <br />Project due to the resources this would require. <br />