Laserfiche WebLink
REFERENCES <br />1) Meeting with Water Division 1, Water District 4 Commissioner Fred Renner. <br />970.669.2026. <br />2) Meeting with Boulder Larimer Ditch Company representatives. <br />3) Feasibility Report for Installation of Toe Drain along North Dam of Ish Reservoir, <br />submitted to Colorado Water Conservation Board, December 1, 1987. <br />4) State of Colorado, Division of Water Resources, Hydrobase database. <br />Boulder Larimer Ditch Memorandum.doc 11 of 11 October 28, 2004 <br />