My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SPDSS_Task5_CBoulder_20050309
CWCB
>
Decision Support Systems
>
DayForward
>
SPDSS_Task5_CBoulder_20050309
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/16/2009 2:22:53 PM
Creation date
7/9/2008 9:45:36 AM
Metadata
Fields
Template:
Decision Support Systems
Title
SPDSS Task 5 - Key Structure, City of Boulder
Decision Support - Doc Type
Task Memorandum
Date
3/9/2005
DSS
South Platte
Basin
South Platte
Contract/PO #
C153954
Bill Number
SB01-157, HB02-1152, SB03-110, HB04-1221, SB05-084, HB06-1313, SB07-122
Prepared By
Leonard Rice Engineering
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
30
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Lawn irrigation return flows (LIRFs) associated with outside uses of water diverted through the <br />City's potable treatment plants have been neither quantified nor adjudicated. <br />General Operating Principles <br />Operation of Boulder's water supply system is governed by the following general principles: <br />• The system is operated to maximize its water supply yield, subj ect to the ability of its <br />water treatment plants to reliably produce high quality finished water. Hydropower <br />generation from the excess water pressure in the system is a secondary objective. <br />• As a first priority in meeting its water demands, the City maximizes its diversions under its <br />direct flow rights. <br />• As a second priority, the City uses its C-BT and Windy Gap supplies as an exchange <br />source for transferring water into its upper Boulder Creek basin reservoirs and pipelines. <br />• As a third priority, during the irrigation season when the Boulder Feeder Canal is running, <br />the City delivers its C-BT and Windy Gap supplies directly into the Boulder Reservoir <br />Water Treatment Plant to supplement native basin and direct flow rights. <br />• The City takes water from its mountain reservoirs or water stored in Boulder Reservoir <br />into the treatment plants to meet any <br />remaining demand. The City attempts to <br />minimize spring and summer releases from <br />its reservoirs in order to preserve this storage <br />water for meeting fall and winter demands <br />and for multi-year drought protection. <br />• The City supplies water to satisfy the <br />commitments made by the City to the <br />Colorado Water Conservation Board for <br />provision of instream flows on North <br />Boulder and Main Boulder Creeks. <br />Boulder Creek - Instream Flow Objectives <br />The City leases any excess C-BT and <br />Windy Gap supplies to agricultural users in Boulder Creek on an annual basis. <br />System Operations <br />The City has obligations to provide potable water supplies within its service area. The City meets <br />demands on its system using a combination of its direct flow water rights, storage in its upper <br />reservoirs and at Boulder Reservoir, C-BT and Windy Gap Project deliveries, and regular use of <br />several water right exchanges. <br />City of Boulder Memo.Doc Page 23 of 30 March 9, 2005 <br />
The URL can be used to link to this page
Your browser does not support the video tag.