My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PROJC01798 (2)
CWCB
>
Loan Projects
>
DayForward
>
0001-1000
>
PROJC01798 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/4/2011 2:47:56 PM
Creation date
7/9/2008 9:29:10 AM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C150265
Contractor Name
Supply Irrigating Ditch Company
Contract Type
Loan
Water District
0
County
Boulder
Loan Projects - Doc Type
Feasibility Study
Supplemental fields
Water Division
1
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
229
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
SECTIONFIVE <br />Selection of Alternatiue and Financial Plan <br />5.6.2 Permitting <br />SIDC has contacted the United States Army Corps of Engineers (USACE) related to <br />environmental permitting. Since the reservoir is off stream, any wetlands impacted by the <br />construction of the project will not be considered Waters of the US, and therefore will not <br />require a 404 permit. Final permitting action will be completed during final design of the <br />project. <br />5.7 BENEFITS <br />If this project was not to be built and the reservoir asset would be lost due to a possible breach <br />order from the SEO the loss would be borne by Brands and the SIDC. The lake is used for <br />storage for imgation water critical to SDIC users. The cost to perform the work is <br />approximately $4,500/AF of storage, based on a reservoir storage volume of 220 AF. <br />UI~S 5-5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.