My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PROJC01798 (2)
CWCB
>
Loan Projects
>
DayForward
>
0001-1000
>
PROJC01798 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/4/2011 2:47:56 PM
Creation date
7/9/2008 9:29:10 AM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C150265
Contractor Name
Supply Irrigating Ditch Company
Contract Type
Loan
Water District
0
County
Boulder
Loan Projects - Doc Type
Feasibility Study
Supplemental fields
Water Division
1
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
229
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
SECTIONFOUR Formulation of Alternatiues <br />, grade at the upstream dam toe. It was indicated in the 2003 Study that seepage was not <br />present along the south dam. Seepage was visible during the test filling. The clay liner <br />~ would also need to be constructed similar along the north dam. <br />3. A, toe drain would be installed along the north dam to intercept seepage that bypass the <br />~ cutoff trench. <br />4. A spillway approximately 200 feet in length would be constructed along the right <br />~ abutment of the south dam. The location of the spillway should be relocated based on ~he <br />~ historical drawings for the project. <br />S. Riprap would be placed along the upstream dam face. <br />t 6. The dam crest would be graded and leveled to gage height 2D. <br />~ 7. The two abandoned outlet works would be excavated, removed, and backfiZled with <br />compacted clay material. <br />8. The existing outlet would be repaired as required to meet SEO Rules. <br />`9. An 8-foot by 8-foot box culvert at the inlet of the reservoir would be constructed to allow <br />for access to the dam. <br />~ I0. Improvements to approximately 2,000 feet of the Suppty Ditch located to the north of the <br />project site would be completed. <br />~ This alternative did not meet the project goals and needs since they have changed since the <br />development of the 2003 Study. This alternative was not considered viable and was not <br />~ considered further. <br />4.4 ALTERNATIVE 2 - MAtNTENANCE <br />This alternative was developed based on the site conditions discovered during the test filling of <br />, the reservoir and the drilling program performed by URS. Isolated areas downstream of the <br />~ northem and southern embankinents became saturated while filling the reservoir. The general <br />locations of the saturated areas are presented in Appendix G. It appears that there is a sand layer <br />~ and loosely compacted embankment material generally associate with the northern embankment <br />seep area. The borings along the southern embankment did not indicate discontinues with <br />~ - ~S 4-2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.