My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PROJC01797 (2)
CWCB
>
Loan Projects
>
DayForward
>
1001-2000
>
PROJC01797 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/11/2011 3:47:57 PM
Creation date
7/9/2008 9:29:08 AM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C150265
Contractor Name
Supply Irrigating Ditch Company
Contract Type
Loan
Water District
0
County
Boulder
Loan Projects - Doc Type
Approval Letter
Supplemental fields
Water Division
1
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
20
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Water Project Loan Program - Project Data <br />Borrower: Supply Irrigating Ditch Company <br />Project Name: Knouth Reservoir Dam <br />Rehabilitation <br />Drainage Basin: South Platte <br />Total Project Cost: $995,000 <br />Type of Borrower: Blended (Ag., Municipal <br />High Income, Commercial) <br />CWCB Loan: $904,960 (Including 1% fee) <br />County: Boulder <br />Project Type: Reservoir Rehabilitation <br />Water Source: St. Vrain Creek <br />Funding Sources: CWCB, Company <br />Aver. Diversion: 4,800 acre-feet <br />Interest Rate: 2.60% Term: 30 years <br />Supply Irrigating Ditch Company services approximately 8,500 acres of irrigated farmland in <br />Boulder County between Lyons and Mead. Currently the water for irrigation is supplied by a direct <br />flow decree and from the Beaver Park Reservoir (which is approx. 25 miles west of the start of the <br />Supply Ditch near the continental divide). Supply Irrigating Ditch Company is in the process of <br />acquiring a storage decree within Knouth Reservoir in exchange for the rehabilitation of the <br />reservoir. This reservoir will give the Company some system flexibility, as this storage is <br />significantly closer to users than Beaver Park Reservoir. The reservoir improvements include: <br />construction of a spillway, removing vegetation from the embankment of the dam, lining select areas <br />on the upstream dam face with a clay liner, placing riprap along the upstream dam face, enclosing an <br />irrigation ditch within a pipe, and installing dam instrumentation. <br />Location Map <br />
The URL can be used to link to this page
Your browser does not support the video tag.