My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
C150255 Contract
CWCB
>
Loan Projects
>
DayForward
>
0001-1000
>
C150255 Contract
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/7/2013 11:11:46 AM
Creation date
7/9/2008 9:28:44 AM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C150255
Contractor Name
Bijou Irrigation Company
Contract Type
Loan
Water District
1
County
Morgan
Weld
Loan Projects - Doc Type
Contract Documents
Supplemental fields
Water Division
1
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
48
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br /> <br /> <br />State of Colorado <br /> <br />Bill R~n~ ' <br />By " ~ <br /> <br />For the Executive Director <br />Department of Natural Resources <br />Colorado Water Conservation Board <br />Jennifer L. Gimbel, Director <br /> <br />By <br /> <br /> <br />By <br /> <br /> <br />ALL CONTRACTS MUST BE APPROVED BY THE STATE CONTROLLER <br /> <br />CRS 24-30-202 requires that the State Controller approve all state contracts. This <br />contract is not valid and there are no loan funds available until the State Controller, or <br />such assistant as he may delegate, has signed it <br />CP v I~ L:r (he (k 1''f(\O II) Ut::t- <br />-t:eslie M. 3heflcfolt, State Controller <br /> <br />By ~C~ <br /> <br />Effective Date <br /> <br />lS-~-O~ <br /> <br />Page 5 of 5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.