My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
C150153 Contract
CWCB
>
Loan Projects
>
DayForward
>
0001-1000
>
C150153 Contract
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/7/2013 8:15:53 AM
Creation date
7/9/2008 9:28:13 AM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C150153
Contractor Name
Dolores Water Conservancy District
Contract Type
Loan
Water District
71
County
Dolores
Loan Projects - Doc Type
Contract Documents
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
32
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br /> <br />RECEIVED <br /> <br />November 30,2006 <br /> <br />ut::,L t) 4 Z006 <br /> <br />Mr. Tim Feehan, P.E. <br />Colorado Water Conservation Board <br />Water Supply Planning and Finance Section <br />1580 Logan Street, Suite 750 <br />Denver, Colorado 80203 <br /> <br />Colorado Water <br />Conservation Board <br /> <br />Dear Tim: <br /> <br />The Dove Creek Secondary Water delivery system project (Contract No. C150153) <br />made substantial construction progress during the summer of 2006. The reservoir was <br />completed which included a 36 mil polypropylene liner, an 8' perimeter security fence, <br />pump plant and electrical service. All delivery supply lines on the north side of U.S. <br />Highway 491 have been installed including 85 water taps. <br /> <br />I would like to request an extension from the Colorado Water Conservation Board, <br />Contract No. 150153 - Dove Creek Secondary Water Delivery System. After a review <br />of the Project Summary - Dolores WCD, it is evident that in Section 10 - Time for <br />Performance, Project Finish: Two (2) years from effective date of this contract of May <br />12, 2004 was not attained. The District requested an extension last year after I became <br />the General Manager for the Dolores Water Conservancy District due to the installation <br />of pipe taking longer than original construction schedule projections. The complex <br />underground utilities that our construction crews have encountered had severely <br />impacted the anticipate completion schedule. I would like to originate a Contract <br />Amendment extension of one (1) year with a revised completion date of December 31, <br />2007. <br /> <br />Thank you for your help with this request and I look forward to working with you in the <br />future on other projects. I would also like to invite you to tour this project anytime you <br />are in the Dove Creek area. <br /> <br />Sincerely, <br /> <br />~~ <br /> <br />Kenny Sr4h s;;: <br />General Manager <br />
The URL can be used to link to this page
Your browser does not support the video tag.