My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
C150153 Contract
CWCB
>
Loan Projects
>
DayForward
>
0001-1000
>
C150153 Contract
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/7/2013 8:15:53 AM
Creation date
7/9/2008 9:28:13 AM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C150153
Contractor Name
Dolores Water Conservancy District
Contract Type
Loan
Water District
71
County
Dolores
Loan Projects - Doc Type
Contract Documents
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
32
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />H. Upon completion of the PROJECT construction, the BORROWER shall provide as-built drawings of <br />the PROJECT to the CWCB staff, or, if required by 9 37-87-105, C.R.S., the BORROWER shall <br />provide the as-built drawings to the State Engineer's Office for approval and filing. <br /> <br />I. Upon completion of the PROJECT construction, the BORROWER shall arrange a final inspection for <br />the CWCB staff. <br /> <br />J. The BORROWER shall pay all of the expenses related to the PROJECT when such bills are due. <br /> <br />K. PROJECT-related expenses incurred prior to the Effective Date of this contract in accordance with <br />the legislative approval of this loan. <br /> <br />SECTION 8 - ELIGIBLE EXPENSES. The following items are eligible for loan disbursements. <br /> <br />A. Preparing final designs and specifications for the PROJECT. <br /> <br />B. Preparing bid and construction contract documents. <br /> <br />C. Preparing environmental assessment or environmental impact statements, and otherwise <br />complying with the Federal National Environmental Policy Act. <br /> <br />D. Complying with all federal, state, and local regulatory requirements, including the obtaining of <br />all required permits. <br /> <br />E. Fish and wildlife mitigation measures required by federal, state, or local laws and regulations. <br /> <br />F. Actual construction as called for in the design documents and in change orders approved by <br />the CWCB and the BORROWER. <br /> <br />G. Engineering services for construction management, including design and construction <br />management for CWCB-approved change orders. <br /> <br />H. Interest during completion of the PROJECT pursuant to Paragraph A.4 of the Contract. <br /> <br />I. Legal services for reviewing engineering services contracts, reviewing this Contract, reviewing <br />construction contract documents, and for complying with all federal, state, and local regulatory <br />requirements. <br /> <br />SECTION 9 - DISBURSEMENT SCHEDULE <br /> <br />For Project costs: The BORROWER shall prepare a periodic progress report which contains a statement <br />of the PROJECT costs expended for that period and shall forward said statement to the CWCB. After <br />receipt of the periodic progress report from the BORROWER, and review and acceptance of the items <br />therein as eligible expenses as described above, the CWCB will pay to the BORROWER the amount set <br />forth in the report or such portion that has been approved by the CWCB. Such payment shall be made <br />within thirty (30) days from the CWCB's approval of each progress report. <br /> <br />SECTION 10 - TIME FOR PERFORMANCE <br /> <br />PROJECT Beginning: Upon Effective Date of this Contract (the date this contract is signed by the <br />State Controller or his designee). <br /> <br />PROJECT Finish: Two (2) years from the Effective Date of this Contract. <br /> <br />Page 3 of3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.