My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
C150153 Contract
CWCB
>
Loan Projects
>
DayForward
>
0001-1000
>
C150153 Contract
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/7/2013 8:15:53 AM
Creation date
7/9/2008 9:28:13 AM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C150153
Contractor Name
Dolores Water Conservancy District
Contract Type
Loan
Water District
71
County
Dolores
Loan Projects - Doc Type
Contract Documents
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
32
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />Project Summary - Dolores WCD - Contract No. C150153 <br /> <br />SECTION 1 -BORROWER INFORMATION <br />Name: The Dolores Water Conservancy District, acting by and through the <br />Dolores Water Conservancy District Water Activity Enterprise <br /> <br />84-0625315 <br /> <br />P.O. Box 1150, Cortez, CO 81321 <br /> <br />(970) 565-7562 <br /> <br />Steve Arveschoug, Manager <br /> <br />Arveschoug@frontier.net <br /> <br />The Dolores Water Conservancy District is a water conservancy <br />district formed pursuant to and governed by Article 45, Title 37, C.RS. <br />and located in Dolores and Montezuma Counties. The Dolores Water <br />Conservancy District Water Activity Enterprise is a water activity <br />enterprise established by the District by Resolution No. 93-02, dated <br />December 14, 1993, pursuant to Article 45.1, Title 37, C. R S., which <br />resolution is incorporated herein by reference. The Enterprise was <br />formed and is operated as an enterprise within the meaning of COLO. <br />CONST. Art. X, Section 20 and C.RS. 9 37-45.1-101, etseq. <br /> <br />SECTION 2 - PROJECT DESCRIPTION <br /> <br />Description of PROJECT: Residents of the Town of Dove Creek, located in Dolores County, currently <br />use existing treated water for outside irrigation. The Borrower has been working with the Town to <br />provide a more cost effective raw water supply for outside irrigation. The Borrower will make <br />available up to 300 acre-feet of its municipal and industrial water from the Dolores Project to meet <br />theoutside irrigation needsof residents of the Town. The Borrower applied to the CWCB for a loan <br />to be used for construction of a secondary water delivery system that will includea new pumping <br />plant to deliver up to 2 cfs; a 5 to 10 acre-foot terminal raw water storage reservoir; 32,000 feet of <br />water delivery pipeline and 307 individual taps with water meters for supplying up to 10 gallons per <br />minute per household, hereinafter referred to as the PROJECT, at an estimated total cost of <br />$981 ,450. <br /> <br />Description of Feasibility Study: The CWCB has reviewed a feasibility study report on the PROJECT <br />entitled "Feasibility Report Dove Creek, Colorado Secondary Water Supply System," dated March <br />2003, updated August 2003, which is incorporated herein by reference, and, based upon the feasibility <br />report, the CWCB determined the PROJECT to be technically and financially feasible. <br /> <br />SECTION 3 - CWCB's AUTHORITY <br /> <br />Small Project Loan: This loan is made pursuant to the provisions of 99 37-60-119 and 37-60-120, <br />C.RS., which authorizes the CWCB to loan money for water projects for the benefit of the people of <br />the State, provided that the borrower assures repayment of that money. <br /> <br />Section 37-60-122(1 )(b) C.RS., authorizes the CWCB to make loans of up to $5,000,000 from the <br />CWCB's Construction Fund and the State Severance Tax Trust Fund Perpetual Base Account Fund <br />without prior approval from the General Assembly <br /> <br />SECTION 4 - BOARD ApPROVAL AND LEGISLATIVE AUTHORIZATION (IF NEEDED) <br /> <br />At its July 2003 meeting, the CWCB approved a Small Project Loan from the Construction Fund to the <br />BORROWER in an amount up to $883,304 for PROJECT costs plus $8,833 for the 1 % loan service <br /> <br />FederallD Number: <br />Address: <br />Phone Number: <br />Contact: <br />Email: <br />Type of Entity: <br /> <br />Appendix 1 to Loan Contract C150153 <br />
The URL can be used to link to this page
Your browser does not support the video tag.