My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SPDSS_AtwoodGage_SummaryReport
CWCB
>
Decision Support Systems
>
DayForward
>
SPDSS_AtwoodGage_SummaryReport
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/17/2013 9:11:12 AM
Creation date
7/8/2008 12:57:01 PM
Metadata
Fields
Template:
Decision Support Systems
Title
SPDSS - South Platte River at Atwood Gaging Station - Summary Report
Description
The project goal was to construct a permanent gage on the South Platte River near Atwood to accurately record discharges of up to about 400 cfs for water rights administration.
Decision Support - Doc Type
Task Memorandum
Date
9/1/2005
DSS Category
Surface Water
DSS
South Platte
Basin
South Platte
Contract/PO #
C153954
Grant Type
Non-Reimbursable
Bill Number
SB01-157, HB02-1152, SB03-110, HB04-1221, SB05-084, HB06-1313, SB07-122
Prepared By
Leonard Rice Engineering
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
APPENDIX 2 COSTS <br />Installation: (2006 Expenses) <br />Green Bros. <br />Reese contracting <br />Ransom Boone Excavating <br />Klindt Charolais <br />Mid-States Supply <br />Norfolk Iron & Metal <br />McATEE Construction <br />Cooper Misc.* <br />Cooper Travel <br />Kimmi Travel <br />Cunning Travel* <br />Kimmi Misc. <br />ATWOOD PROJECT <br />FINAL COST BREAKDOWN <br />September 26, 2005 <br />1152.50 <br />1293.72 <br />2850.00 <br />855.64 <br />346.68 <br />682.50 <br />296.12 <br />828.42 <br />103.58 <br />90.00 <br />37.57 <br />85.35 <br />Pre-Construction: (2005 & 2004 Expenses) <br />State Land Board 600.00 <br />HC PECK 500.00 <br />Glenn's Portable Welding* 3769.40 <br />Sutron* (Apx.) 5000.00 <br />TOTAL: 18,491.48 <br />NOTES <br />(8622.08) <br />(9869.40) <br />Cooper Misc. Expense for gage hardware was final bill for project. (Submitted on 9/20/05.) <br />Cunning's Travel Expense did not include the motel bill, which was billed to Div 1 credit card. <br />Glenn's Welding came in 3bills--$2000 deposit in 04; and $1500 for fabrication & 269.40 for <br />storage/modifications in O5. <br />Sutron equipment combined with another CWCB order by Jeff Baessler. Costs not received by <br />Division One. <br />NOT INCLUDED-Purchased by Hydrographic Program: <br />2 Staff Sections & Mounting Posts <br />Electric Drop Tape Assembly With 25' Tape; <br />Flush key pipes & fittings. <br />Solar Charge Battery <br />
The URL can be used to link to this page
Your browser does not support the video tag.