My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PROJC01790 (2)
CWCB
>
Loan Projects
>
DayForward
>
1001-2000
>
PROJC01790 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/4/2011 3:38:46 PM
Creation date
7/8/2008 10:12:21 AM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C150199
Contractor Name
Bijou Irrigation District
Contract Type
Loan
Water District
1
County
Morgan
Weld
Loan Projects - Doc Type
Project Completion Letter
Supplemental fields
Water Division
1
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
11
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />, <br /> <br />STATE OF COLORA~DO <br /> <br />Colorado Water Conservation Board <br /> <br />Department of Natural Resources <br />1313 Shennan Street, Room 721 <br />Denver, C)lorado 80203 <br />Phone:~03)866-3441 <br />FAX: (303) 866-4474 <br /> <br /> <br />(Revised) <br />Memorandum <br /> <br />Bill Ritter Jr. <br />Governor <br /> <br />Harris D. Sherman <br />Executive Director <br /> <br />TO: <br /> <br />C~lorado Water cons~rvation Boar~M~. be . <br /> <br />TIm Feehan, P.E., proJec~an ger o'. ' <br />Mike Serlet, P .E., Chief ~' <br />Water Supply Planning an . Finance S IOn <br /> <br />Rod Kuharich <br />CWCB Director <br /> <br />Dan McAullife <br />Deputy Director <br /> <br />FROM: <br /> <br />DATE: May 4, 2007 <br /> <br />SUBJECT: Consent Agenda, Item la, May 22-23, Board Meeting <br />Water Supply and Finance - Revisions to Existing Loans <br />Bijou Irrigation District - Empire Reservoir Rehabilitation <br /> <br />INTRODUCTION <br />At the May, 2005 Board Meeting, the Board authorized staff to present revisions to existing <br />loans totaling less then 20% of the original loan as Consent Agenda Items. The Bijou Irrigation <br />District loan increase presented below is less than 20%. <br /> <br />The Bijou Irrigation District (District) is requesting an increase of$50,783 to their May 2005 <br />authorization of $672,660 for Empire Reservoir Rehabilitation Project. The requested loan <br />increase is based on actual qualified legal, engineering, and construction costs to complete the <br />proj ect. <br /> <br />BACKlGROUND <br /> <br />The District owns and operates Empire Reservoir located west of Fort Morgan in Weld and <br />Morgan Counties, between 1-76 on the south and US Highway 34 on the north. The District <br />provides irrigation water to a 19,177-acre service area in Morgan County, located betw"een the <br />reservoir and the City of Fort Morgan. Water stored in the reservoir is delivered to users <br />through a sister company, Bijou Irrigation Company, which operates and maintains the <br />distribution system, used for either direct irrigation or exchanges. Empire Reservoir is used to <br />supplement the direct flows, typically in July and August. Annual delivery from the reservoir is <br />about 19,900 acre-feet. <br /> <br />The lake has a surface area of2,842 acres. The District has a right to store 37,709 AF, but the <br />maximum storage is 36,142 acre-feet at gage height (GH) 30.0. The reservoir was restricted <br />(since March 1985) to GH 29.0 water surface elevation by the State Engineer's Office (SEa), <br />due to safety concerns resulting from the absence of a spillway. This one foot reduction in gauge <br /> <br />1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.