My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
RGDSS_Task8-8_HistoricMonthlyModel_BaseflowCheckandSimulationRuns
CWCB
>
Decision Support Systems
>
DayForward
>
RGDSS_Task8-8_HistoricMonthlyModel_BaseflowCheckandSimulationRuns
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/26/2011 8:35:55 AM
Creation date
7/8/2008 9:11:06 AM
Metadata
Fields
Template:
Decision Support Systems
Title
RGDSS Task 8-8 - Phase 1c Historic Monthly Model - Evaluate Baseflows, Verify Model Operation, and Historical Diversion Check Runs and Analysis
Description
Memo documenting Phase 1c baseflow, check and simulation runs.
Decision Support - Doc Type
Task Memorandum
Date
9/27/2000
DSS Category
Surface Water
DSS
Rio Grande
Basin
Rio Grande
Contract/PO #
C153863
Grant Type
Non-Reimbursable
Bill Number
HB98-1189, SB99-173
Prepared By
Leonard Rice Engineering
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
17
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
RGDSS Memorandum <br />Final <br />TO: Ray Bennett <br />FROM: Ed Armbruster, Hydrosphere <br />SUBJECT: RGDSS Surface Water, Task 8.8 -Phase 1c Evaluate Baseflows, Verify <br />Model Operation, and Historical Diversion Check Runs and Analysis <br />DATE: September 27, 2000 <br />CC: Randy Seaholm <br />Introduction <br />This memorandum represents delivery associated with Task 8.6 (Generate and Evaluate <br />Baseflows), Task 8.7 (Verify Model Operation -Check Mode), and Task 8.8, Historical <br />Diversion Check Runs and Analysis. The objectives of these tasks are as follows: <br />Task 8.6: Operate StateMod model in Baseflow mode with Phase 1 c monthly input files. <br />Generate and evaluate Baseflows checking for reasonableness. <br />Task 8.7: Operate StateMod model in Check mode with Phase 1 c monthly input files. <br />Evaluate and correct input data based on generated error messages. <br />Task 8.8: Operate StateMod model in Simulation mode with Phase 1 c monthly input files <br />and Baseflows. Evaluate results for reasonableness of the resulting flows and diversions. <br />Review of Phased Modeling Approach <br />The Rio Grande Surface Water Model is being developed in a phased approach whereby an <br />increasing percentage of basin-wide consumptive use is represented. When the model is <br />completed, 100 percent of consumptive use in the basin will be represented by numerous <br />agricultural, municipal and industrial demands. In Phase la efforts, modeled demands reflect <br />approximately 90 percent of the total decreed surface water use in the basin (by roughly 425 <br />different water users). In Phase la of model development, the remaining decreed surface water <br />use is "left in the gage." Phase lb of model development builds upon Phase la results and <br />models 100 percent of consumptive use associated with lands served by surface diversions. <br />Finally, Phase lc builds upon previous efforts by including groundwater use, and results in a <br />model that includes 100 percent of all surface water and groundwater use in the basin. <br />This memorandum describes the creation of the Phase lc input files required to include <br />groundwater use that includes well stations, well water rights, well return and depletions and well <br />pumping. In addition, major enhancements included in the Phase lc model are described which <br />include the addition of municipal well use, the enhancement of surface water efficiencies, and <br />operation of the Rio Grande Compact. <br />C:Acdss\Task8-8.doc Phase lc Model September 27, 2000 -Page 1 of 17 <br />
The URL can be used to link to this page
Your browser does not support the video tag.