Laserfiche WebLink
e ~+-~ "+~•'~, <br />~. ~,~'~ ~ "~~, <br />~ ~ F~ R <br />m~ ':r <br />~ ` ~. - <br />~ ;, ~. <br />.~, ~ <br />~ ~ <br />, e <br />{ i~:i; e <br />~ :~ il s: 7i~:~~ ~~~ ~ <br />~ <br />tl,11°C~.ti9&i 4.°1 "; ~ µ <br />I v,~~~~l4~~~. <br />I~:~~~Il~~ °Lr.'~ <br />Approved Water Supply Reserve Account Applica~tions by the CWCB Board <br /> <br />Metro Basin Total Request $496,5~0 $200,000 $696,580 <br />Chatfield Reallocation EISIFR (South Platte BRT contributing $27,000) $103,000 $103,000 <br />Zero Liquid Discharge Pilot Study $200,000 $200,000 $400,000 <br />Parker Water and Sanitation and Colorado State University Joint Project on a <br />RurallUrban Farm Model $150,000 $150,000 <br />Upper Mountain Counties Water Needs Assessment (South Platte contributing) $43,580 $43,580 <br />North Platte Basin Total Request $116,000 $0 $116,000 <br />New Pioneer Ditch Diversion Reconstruction Praject $116,000 $116,000 <br />Rio Grande Basin Total Request $384,950 $1,692,000 $2,076,950 <br />Alamosa River Instream Flow Project $64,500 $64,500 <br />Preliminary Design Multi-use Rio Grande Reservoir Rehabilitation and Enlargement $288,000 $288,000 <br />Rio Grande Basin Conservation Reserve Enhancement Program $36,750 $36,750 <br />Alamosa River Watershed Restoration Project $104,000 $104,000 <br />Romero-Guadalupe Channel Rectification Project $83,700 $83,700 <br />Rio Grande Initiative $200,000 $1,300,000 $1,500,000 <br />South Platte Basin Total Request $434,563 $278,476 $713,U39 <br />Chatfield Reallocation EISIFR (Metro BRT contributing $103,000) $27,000 $27,000 <br />Clear Creek Water BankinglHigh Altitude Storage $52,000 $52,000 <br />Ovid Reservoir Comprehensive Feasibility Study $176,000 $176,000 <br />Lower South Platte Wetland Initiative Phase I South Platte River, CO $278,476 $278,476 <br />Stage Discharge Data Loggers and Telemetry $48,800 $48,800 <br />Upper Mountain Counties Water Needs Assessment (Metro contributing) $130,763 $130,763 <br />Southwest Basin Total Request $272,700 $2,260,000 $2,532,700 <br />Dry Gulch ReservoirlSan Juan Reservoir Land Acquisition $1,000,000 $1,000,000 <br />Goodman Point Water Association Pipeline Environmental Assessment $7,700 $7,700 <br />Goodman Point Phase 2 $20,000 $240,000 $240,000 <br />Jackson Gulch Reservoir Expansion Project $80,000 $80,000 <br />Lake Mancos Dam (Jackson Gulch Reservoir Expansion Project) $20,000 $20,000 <br />Bauer Lakes $40,000 $40,000 <br />La Plata West Rural Water Supply System $100,000 $1,000,000 $1,100,000 <br />Town of Sawpit - EngineeringlPlanning for pomestic Water System; Southwest Basin $25,000 $25,000 <br />VampalWhitelGreen Basin Total Request $357,510 $150,000 $507,510 <br />Energy Development Water Needs Assessment (300,000 Joint Application see <br />Colorado) $150,000 $150,000 <br />Morrison Creek Reservoir Feasibility Study $49,500 $49,500 <br />Agricultural Water Needs Assessment $201,410 $201,410 <br />Common Data Repository $106,600 $106,600 <br />Further information regarding the Interbasin Compact Process accomplishments and support provided to the <br />basin roundtables to further their basinwide needs assessments can be found at: <br />http://ibcc.state.co.us. <br />Information on the Water Supply Reserve Account and continuing S1NS1 activities is located on C1NCB's webpage: <br />http:/Icwcb.s~ate.co.us/I ~iD/. <br />