Laserfiche WebLink
<br />The project will have no significant social impact as the reservoir will continue to <br />operate as it has in the past. Physical impact includes the changes in the dam and <br />the addition of a buttress to the downstream face of the dam. <br /> <br />Conclusions <br /> <br />1. Granby Ditch & Reservoir Company, Inc. is an incorporated entity is the <br />State of Colorado with the ability to enter into a contract with the Colorado Water <br />Conservation Board for the purpose of obtaining a construction loan. <br /> <br />2. The project will allow GDRC to retain and store existing water rights and <br />provide additional water for the beneficial use of the shareholders. <br />