My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
C150263 Feasibility Study
CWCB
>
Loan Projects
>
DayForward
>
0001-1000
>
C150263 Feasibility Study
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/9/2011 2:15:42 PM
Creation date
7/7/2008 11:13:11 AM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C150263
Contractor Name
Loveland Lake and Ditch Company
Contract Type
Loan
Water District
0
County
Larimer
Loan Projects - Doc Type
Feasibility Study
Supplemental fields
Water Division
1
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
77
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />CWCB Construction Fund Loan Application <br /> <br />Please provide a brief description of the owner's existing water supply facilities and <br />describe any existing operational or maintenance problems. Attach separate sheets <br />if needed, and a map of the service area. See attachments "Part A, Item 4: Map of <br />Service Area" on page 19 and "Part A, Item 4: Description of Water Supply Facilities <br />and Existing Operational or Maintenance Problems" on page 20. Or if part of the <br />Feasibility Study, see that document's contents. <br /> <br />For existing facilities indicate: <br />Number of shareholders: 48 or Number of customers served: <br />Current Assessment per share: $125.00 Number of shares: 150 <br />Number of acres irrigated: Aprox. 500 Water Right: 2.908.2 acre-feet. <br /> <br />Average water diverted per year: Due to drought, in the last 5 years we've only had one year <br />in which we were able to divert water and at that time we got about 1,000 acre-feet. <br /> <br />Part B. - Description of the Project <br /> <br />1. Name of the project or facility: Inlet Upgrade <br /> <br />2. Purpose of this loan application. Check one. <br />New project <br />Rehabilitation or replacement of existing facility <br />X Enlargement of existing facility <br />Emergency Repair <br />Other (describe) <br /> <br />3. If the project is for rehabilitation of an existing reservoir, is the reservoir currently <br />under a storage restriction order from the State Engineer? N/ A <br /> <br />General location of the project. (please include county, and approximate distance <br />and direction from nearest town, as weD as legal description, if known. Loveland <br />Reservoir is located in Larimer County and borders the town of Berthoud on the west <br />side of the town. See attachment "Part B, Item 4: Legal Description" on page 21 for a <br />legal description. Or ifpart of the Feasibility Study, see that document's contents. <br /> <br />4. Please provide a brief narrative description of the proposed project including <br />purpose, need, facilities, type of water uses to be served and service area. Attach <br />separate sheet, if needed. See attachment "Part B, Item 5: Description of the Proposed <br />Project" on page 22. Or ifpart of the Feasibility Study, see that document's contents. <br /> <br />2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.