<br />As bid by the selected contractor with supplemental costs described on page 10, the <br />estimated cost of the completed project is $135,000. The cost breakdown is summarized <br />in Table 1. <br /> <br />Table 1. Loveland Lake & Ditch Company - Inlet UJ ,grade Prolect - Cost Estlm <br />Item Quantity Unit Unit Price $ Amount $ <br />Mobilization 1 Job 2,000.00 $2,000.00 <br />36" RCP storm pipe installed 35 LF 55.00 $1,925.00 <br />36" RCP 17 degree bend installed 1 EA 1,273.00 $1,273.00 <br />30"RCP storm pipe installed 1312 LF 40.00 $52,480.00 <br />30"f1ared end section installed 1 EA 608.00 $608.00 <br />Granular bedding material installed 426 CY 11.00 $4,686.00 <br />5' diameter manhole installed 2 EA 2,820.00 $5,640.00 <br />Concrete flume with grate installed 1 EA 18,901.00 $18,901.00 <br />36" headgate installed 1 EA 8,327.00 $8,327.00 <br />Riprap installed 27 CY 86.00 $2,322.00 <br />36" Parshall flume installed 1 EA 6,605.00 $6,605.00 <br />Surface restoration 1 LS 200.00 $200.00 <br />Removal of excess material 1 CY 15.00 $15.00 <br />Pot hole existing L lWD Main 1 EA 200.00 $200.00 <br />Remove and place broken concrete 1 LS 200.00 $200.00 <br />Engineering costs 1 Job 15,000.00 $15,000.00 <br />Outlet repair completion 1 Job $5,000.00 $5,000.00 <br />Contingency 1 Job 10,000.00 $10,000.00 <br />Total I $135,382 <br /> <br />ate <br /> <br />Loveland Lake and Ditch Company <br />Inlet Structure Upgrade Feasibility Study <br />February 1,2008 <br /> <br />11 of 47 <br />