My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
C150263 Approval letter
CWCB
>
Loan Projects
>
DayForward
>
1001-2000
>
C150263 Approval letter
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/9/2011 2:15:42 PM
Creation date
7/7/2008 11:13:08 AM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C150263
Contractor Name
Loveland Lake and Ditch Company
Contract Type
Loan
Water District
0
County
Larimer
Loan Projects - Doc Type
Approval Letter
Supplemental fields
Water Division
1
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />Loveland Lake and Ditch Company <br />Updated March 20, 2008 <br />Page 3 of 5 <br /> <br />Agenda Item 18a <br /> <br />Project Description <br /> <br />The purpose of this project is to enhance the means for the Company to continue providing irrigation <br />water to shareholders by increasing the inlet capacity to take advantage of storage opportunities as <br />the Reservoir comes into priority. Five alternatives were considered: <br /> <br />1. The no-action alternative. <br /> <br />2. Reinstate the ravine as the inlet for the Reservoir. <br /> <br />3. Abandon the old easement in favor of a new easement that follows the path of the ravine, <br />which is a shorter path to the Reservoir by nearly halfthe distance. <br /> <br />4. Replace the existing pipe with a larger pipe. <br /> <br />5. Install a pipe parallel to the existing pipe. <br /> <br />Alternative No.1 - No action was considered unacceptable since the Company could not reasonably <br />be expected to store the amount of water needed to deliver water to its shareholders, given the <br />restrictive rate ofthe existing inlet and the relatively short window in which the Reservoir is <br />typically in priority during the year. <br /> <br />Alternative No. 2- Reinstating the ravine as the inlet was ruled out because of the potential for <br />continued and exorbitant expenses related to cleaning up the trash that have accumulated in the <br />ravine over decades of unrestricted and unsanctioned dumping into the ravine. <br /> <br />Alternative No.3 - Following a shorter path with an easement through the ravine was ruled out due <br />to the resistance of the property owner to allow the location of the right of way to be moved. <br /> <br />Alternative No. 4- Replacing the existing inlet pipe was ruled out due to the expense of removing the <br />existing structures on top of the expense of installing a new line. <br /> <br />Alternative No. 5 - Installing a new pipe parallel to the existing line was selected since it was the <br />least expensive option to achieve the goal of increasing inlet capacity and was acceptable to the <br />Company. <br /> <br />The selected alternative, Alternative No.5, involves installation of a larger, 30 inch pipe parallel to <br />the existing pipe along with the supporting gate structure and flume. The new 30 inch pipe will be <br />able to deliver 50 cfs. The existing pipe will be left in place so that both may be operated <br />concurrently if the opportunity arises. In addition to the 30 inch pipe, a new headgate off the Handy <br />Ditch to open into the new line, and a new flume capable of measuring up to 50 cfs will be installed. <br />Additionally, repair work will be done on the outfall structure where erosion has caused damage. <br /> <br />Loonan & Associates, Inc. has prepared engineering designs and cost estimates for the project. <br />Construction began in February 2008. If construction is completed as scheduled, the new pipe line <br />should be operational by May 2008. <br /> <br />Project Cost Estimate <br /> <br />Engineering <br />Pipeline Construction <br />Outlet Repairs <br />Total <br /> <br />$15,000 <br />$115,000 <br />$5,000 <br />$135,000 <br />
The URL can be used to link to this page
Your browser does not support the video tag.