<br />.
<br />
<br />.
<br />
<br />.
<br />
<br />Table 6.2 Corrected and Existing FEMA Water Surface Profiles.
<br />
<br />Cross Section Corrected Effective Condition Existing Condition Difference in Water Surface Elevations!
<br />ID:Station Water Surface Elevations (ft, NGVD\ Water Surface Elevations Cft, NGVm Location
<br /> IO-Year 50-Year IOO-Year SOO-Year IO-Year 50-Year IOO-Year SOD-Year to-Year 50-Year lOO-Year ~nn 'T___
<br /> ;,UU..I Citl
<br /> Cache la Poudre River Main Channel
<br />As Reported In: CEIOOQ06 CEIOOQ06 CEIOOQ06 CESOOQ06 EXIOOQ06 EXIOOQ06 EXI00Q06 EXSOOQ06
<br />AJ:2l8012 4922,7 4923,8 4924,2 4924,9 4922,7 4923,8 4924.2 4924.9 0,0 0,0 0,0 0,0 D/S Current Study Limit
<br />D/S Timnath Diversion Dam
<br />218017 4924.6 4924,5 4924,5 4925,0 4924,6 4924.5 4924,5 4925.0 0.0 0.0 0.0 0,0 VIS Timnath Diversion Dam
<br />218990 4925.1 4926,0 4926,7 4927,5 4925.1 4926,0 4926.7 4927,5 0,0 0,0 0,0 0,0
<br />AK.;2 I 9777 4925,9 4927,2 4927,9 4929,0 4925.9 4927,2 4927,9 4929,0 0,0 0,0 0,0 0,0
<br />AL:220627 4927,6 4929,5 4930.3 4931.5 4927.6 4929,5 4930.3 4931.5 0,0 0,0 0,0 0,0
<br />221637 4929.1 4931.1 4931.9 4933.3 4929,1 4931.1 4931.9 4933.3 0,0 0,0 0.0 0.0 D/S Lemay Bridge
<br />AM:22l702 4929.1 4931.1 4931.9 4933.3 4929.1 4931.1 4931.9 4933.3 0,0 0,0 0,0 0,0 VIS Lemay Bridge
<br />222377 4930,8 4933.2 4934.4 4936.5 4930.8 4933,2 4934.4 4936,5 0.0 0,0 0,0 0,0 D/S Mulberry Bridge
<br />AN:222452 4930,8 4933,2 4934.4 4936,8 4930,8 4933,2 4934,4 4936.8 0.0 0,0 0.0 0.0 U/S Mulberry Bridge
<br />AO:2236l7 4933.3 4935.6 4936,7 4939.1 4933.3 4935,6 4936,7 4939.1 0,0 0,0 0,0 0,0
<br />AP:224597 4939,0 4939,7 4939,9 4940,9 4939.0 4939,7 4939.9 4941.0 0.0 0,0 0,0 0.1
<br />AQ:226l67 4941.0 4942,7 4943,4 4944.3 4941.0 4942,7 4943,4 4944,9 0,0 0.0 0,0 0,6 Lincoln Spill & Linden Spill
<br />Confluence
<br />AR:227397 4943.1 4945.8 4946.6 4948.3 4943.1 4945,8 4946,6 4948.5 0,0 0.0 0.0 0,2 D/S Lincoln Bridge
<br />227437 4943,4 4946,2 4947,0 4949,5 4943.4 4946,2 4946.9 4948,9 0,0 0,0 -0,1 -0,6 D/S Project Limit
<br />VIS Lincoln Bridge
<br />AS:228117 4947,1 4950.3 4951.6 4953,4 4947.0 4950.3 4951.5 4952,9 -0.1 0.0 -0.1 -0,5 Lincoln Spill Divergence
<br />Lateral Spill Over Left Bank
<br />228637 4948.3 4951.9 4953,7 4957.5 4948.3 4951.9 4953.5 4955,5 0.0 0.0 -0,2 -2,0 U/S Project Limit
<br />D/S Linden Bridge
<br />A T:228687 4948.3 4951.9 4953,7 4957,5 4948.3 4951.9 4953.5 4956,8 0,0 0,0 -0,2 -0.7 U/S Linden Bridge
<br />229322 4949,6 4952,7 4954.5 4957.6 4949.6 4952,7 4954,4 4957,5 0,0 0,0 -0,1 -0.1
<br />AV:229477 4951.8 4954,9 4956.5 4959,9 4951.8 4954.9 4956.4 4959.7 0,0 0,0 -0,1 -0,2 Linden Spill Divergence
<br />Lateral Spill Over Left Bank
<br />229757 4952,7 4955.2 4956.5 4959,7 4952,7 4955,2 4956,5 4959.5 0,0 0.0 0,0 -0.2
<br />229997 4953,8 4956,6 4958.2 4961.2 4953,8 4956,6 4958.2 4961.2 0,0 0,0 0,0 0,0 D/S B.N,R.R. Bridge
<br />AV:230017 4953.8 4956,7 4958.3 4961.4 4953,8 4956,7 4958.3 4961.4 0,0 0,0 0,0 0,0 UlS B.N,R.R, Bridge
<br />230193 4953,9 4956,6 4958.5 4963.4 4953,9 4956.6 4958,5 4963,4 0,0 0.0 0,0 0.0
<br />230355 4957,5 4958,9 4959.5 4963,6 4957.5 4958.9 4959,5 4963,6 0.0 0.0 0,0 0,0 Center of Boat Chute
<br />AW:230467 4958,9 4961.8 4962.6 4963,8 4958,9 4961.8 4962,6 4963,8 0,0 0,0 0,0 0.0 D/S Coy Ditch
<br />Diversion Dam
<br />
<br />("l
<br />~
<br />("l
<br />N
<br />o
<br />o
<br />':'
<br />o
<br />o
<br />~
<br />c:r
<br />o
<br />~
<br />'"rj
<br />
<br />~
<br />t""'
<br />o
<br />~
<br />Q..
<br />o
<br />n
<br />
<br />0'1
<br />:.,.
<br />
<br />)>
<br />:z
<br />Q..
<br />m
<br />N
<br />VI
<br />o
<br />:z
<br />(')
<br />o
<br />:z
<br />VI
<br />c::
<br />s:
<br />:z
<br />~
<br />m
<br />:z
<br />..f2.
<br />:z
<br />m
<br />m
<br />N
<br />~VI
<br />
<br />:z
<br />r
<br />
|