My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Lefthand OHV Area Restoration
CWCB
>
Watershed Protection
>
DayForward
>
Lefthand OHV Area Restoration
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/28/2009 9:59:42 PM
Creation date
6/11/2008 2:46:39 PM
Metadata
Fields
Template:
Watershed Protection
Document ID
sev_0001
Contract/PO #
PO 08-30
County
Boulder
Stream Name
Lefthand Creek
Basin
South Platte
Sub-Basin
St. Vrain 10190005
Water Division
1
Title
Lefthand Off-Highway Vehicle Area Restoration Project
Date
4/18/2008
Prepared For
CWCB
Prepared By
James Creek Watershed Initiative
Watershed Pro - Doc Type
Project Report
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
C. EVALUATION OF OBJECTIVES AND TASKS <br />Objective 1. Preplanning and Coordination <br />Task 1: Form Restoration Team and Design Restoration Plan <br />The Restoration Planning Team was formed at the beginning of Phase 1 to work on <br />designing a Restoration Plan for the project area. The Team participated in field trips to <br />the project area and attended scheduled meetings which resulted in Restoration Plans <br />for each project Reach. The Team accomplished the following: <br />o Completed detailed assessments of each project Reach; <br />o Identified areas that will be reclaimed; <br />o Identified BMPs and resources needed for the project; <br />o Identified and measured areas for post and cable fencing; <br />o Developed a project map of the area; <br />o Identified cost estimates for projects during 2006 - 2008; <br />o Ranked project priorities; and <br />o Created a timeline for restoration work. <br />Task 2: Facilitate Involvement and Information Sharing <br />Project partners have informed the community, stakeholders and partners about the <br />restoration project in the following ways: <br />o Monthly reports at the Boulder Ranger District's OHV meetings; <br />o Articles about the project have been included in newsletters of the Lefthand <br />Watershed Oversight Group and Boulder Ranger District; <br />o Project information and volunteer opportunities have been posted o the <br />Wildlands Restoration Volunteers' website; and <br />o Mailing to 300 stakeholders inviting them to participate in the fall 2007 restoration <br />day events. <br />Task 3: Develop Construction Plans and Prepare Restoration Sites <br />Our project partners, Wildlands Restoration Volunteers, developed site-specific <br />construction plans for the September 2007 Lower Ridge Restoration Project. They <br />delineated the project's work zone, developed a detailed schedule of construction events <br />and participants roles, prepared the staging area, and recruited and trained the <br />volunteers. The Boulder Ranger District developed site-specific construction plans for <br />Upper Carnage Creek Restoration Project. They recruited and trained volunteers <br />(AmeriCorps, Trailridge Runners 4x4 Club, Big Thompson 4x4 Club and Wildlands <br />Restoration Volunteers) to help with post and cable fencing. <br />
The URL can be used to link to this page
Your browser does not support the video tag.