Laserfiche WebLink
<br />Central Weld in the past, but the Town is currently constructing a <br />1.5 Million Gallon water storage tank. <br /> <br />c) Description of the Project. <br /> <br />Firestone's current rate structure is as follows: <br /> <br />Table 3 - Current Rate Structure <br /> <br /> Rate for <br /> Water Included Additional Water Add itional <br /> in Base Rate Beyond Base Water per 1,000 <br />Tap Size Base Rate (gal) (gal) gal <br />5/8" $22.75 5,000 5,001-15,000 $1.50 <br /> 15,001-20,000 $1.75 <br /> above 20,000 $2.25 <br />3/4" $34.25 7,000 7,001-15,000 $1.50 <br /> 15,001-20,000 $1.75 <br /> above 20,000 $2.25 <br />1" $57.00 12,000 above 12,000 $1.75 <br />1.5" $136.50 30,000 above 30,000 $1.75 <br />2" $227.50 50,000 above 50,000 $1.75 <br />3" $524.75 115,000 above 115,000 $1.75 <br />4" $932.00 204,000 above 204,000 $1.75 <br />6" $2,095.50 460,000 above 460,000 $1.75 <br /> <br />Firestone has never completed a formal rate study. As can be seen, their current <br />rate structure does not encourage water conservation. Firestone would like to <br />study their current cost of service, anticipated project needs, and water <br />conservation goals to establish new rates appropriate for the Town. <br /> <br />The objective of the rate study is to determine water rates for all customer <br />categories based on cost-of-service standards contained in AWWA Manual M1. <br />The Base-Extra Capacity cost allocation methodology will be utilized. Rates will <br />be developed to insure revenues are adequate to fund existing and anticipated <br />water enterprise expenditures. <br /> <br />As recommended in the recently completed 2007 Firestone Water Conservation <br />Plan, alternative rates that encourage conservation will be developed and <br />presented for consideration by the staff and Town Board. <br /> <br />Rate-making principles and alternative rate structures will be presented to the <br />Town Board. We will propose a maximum to three rate structures with one <br />identified as the preferred alternative. <br /> <br />The tasks associated with the Project include: <br /> <br />@ Clear Water Solutions, Inc. <br />Town of Firestone CWCB Water Efficiency Grant Application <br /> <br />': <br />