My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Vandiford Ditch Reconstruction
CWCB
>
Watershed Protection
>
DayForward
>
Vandiford Ditch Reconstruction
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/11/2010 2:07:43 PM
Creation date
6/9/2008 3:04:34 PM
Metadata
Fields
Template:
Watershed Protection
Document ID
hr_0023
Contract/PO #
PO 07-32
County
Gunnison
Delta
Community
Hotchkiss
Stream Name
North Fork Gunnison River
Basin
Gunnison
Sub-Basin
North Fork Gunnison 14020004
Water Division
4
Title
Vandiford Ditch Diversion Reconstruction Project Final Report
Date
2/15/2008
Prepared For
CWCB
Prepared By
North Fork River Improvement Association
Watershed Pro - Doc Type
Project Report
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
PROJECT COSTS <br />Vandiford Ditch Diversion Final Cost <br />Objective or Name of <br />Task Date Payee Description of Expenditure Total Cost <br />Field Survey & In-Kind; not to be Survey & aerial photography of existing <br />topography reimbursed topography & conditions $11,000.00 <br /> Produce plans and specs of headgate, <br />Design & headwall, in-stream diversion and bank <br />Engineering 9/7/2007 Crane Associates stabilization structures. $10,000.00 <br />Mobilization & Curry Stage equipment and boulders. Divert <br />Water Control 11/2/2007 Construction water from construction site. $2,500.00 <br />Headgate & Form & pour 16.26 cu yd concrete; bed <br />Headwall 11/3- Curry & install 100 ft 24 in galy CMP pipe; <br />Construction 15/2007 Construction backfill and compact backfill & bank. $29,662.00 <br /> ECO Contracting <br />Diversion 11/26-12/1 & Curry Haul & place large rock; remove 3,000 <br />Construction 2007 Construction cu yd gravel material. $6,964.00 <br />Bank Stabilization Curry Place rock for bank stabilization; move <br />& revegetation 12/3-7/2007 Construction 3,000 cu yd gravel material. $7,000.00 <br />Demobilization & Curry Remove 1,000 cu yd gravel material; <br />Site Restoration 12/11/2007 Construction smooth & reslope. $700.00 <br />Project <br />Coordination & Project Management & Contract <br />Management 11/1/2007 NFRIA Administration $2,470.00 <br />In-kind, boulder Large rock for diversion structure & bank <br />donations, 9/10- stabilization; remove gravel; equipment <br />equipment time. 10/20/2007 time by Ditch Company. $14,290.00 <br />Total $84,586.00 <br />Monitoring and Future Actions .. Stream profiles have been established to monitor the <br />effects of the project on stream bank and stream bed erosion. A water quality monitoring <br />program, with monitoring sites above and below the project, has been established; six <br />years ofpre-project data water quality are available. Post-project data will be collected. <br />Periodic fish sampling is conducted by the Colorado Division of Wildlife. Results from <br />these monitoring activities will provide a means of evaluating the long-term effects of the <br />project. <br />Four similar projects conducted on the river in the past eight years have shown positive <br />results on water quality, fish habitat, riparian vegetation and bank stabilization. <br />Landowners who have participated in these past projects have been pleased with the <br />results and support further projects. Completion of the project has been advertised <br />
The URL can be used to link to this page
Your browser does not support the video tag.