My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
DRI Final Invioice Propane Gen ST08
CWCB
>
Weather Modification
>
DayForward
>
DRI Final Invioice Propane Gen ST08
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/28/2009 2:31:47 PM
Creation date
6/9/2008 2:46:57 PM
Metadata
Fields
Template:
Weather Modification
Applicant
Desert Research Institute
Sponsor Name
CWCB
Project Name
Fabricating a Remotely Controleed Propane Dispenser for the Grand Mesa WM Program
Title
Fabricating a Remotely Controleed Propane Dispenser for the Grand Mesa WM Program
Prepared For
CWCB
Prepared By
Desert Research Institute
Date
2/21/2008
County
Mesa
State
CO
Country
USA
Weather Modification - Doc Type
Report
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />eORI <br /> <br />Desert Research Institute <br /> <br />June 4, 2008 <br /> <br />Mr. Joe Busto <br />ewCB Flood Protection Program <br />1313 Sherman St., Room 721 <br />Denver, CO 80203 <br />Re: P.O. #OE PDA 08000000079 <br /> <br />Dear Mr. Busto: <br /> <br />As specified in the Statement of Work under Project Tasks and Deliverables the Final Report for <br />the project, Fabricating a Remotely Controlled Propane Cloud Seeding Dispenser for a Colorado <br />Weather Modification Program, is due in June 2008. This letter constitutes the Final Report which <br />confirms that all tasks specified in the Statement of Work have been accomplished. The details were <br />provided in the previously submitted reports for Tasks 1 and 2, both dated 21 May 2008. <br /> <br />The propane dispenser has been disassembled and prepared for shipment to Colorado for <br />installation on tbe Grand Mesa in the late summer or fall of 2008. DRI will coordinate with ewCB and <br />Grand Mesa cloud seeding personnel to detennine the exact location and date for installation. <br /> <br />An invoice for the costs incurred in completing the Final Report is attached. <br /> <br />Sincerely, <br /> <br />(}d... tJ. llofi- <br /> <br />Arlen W. Huggins <br />Project Manager <br /> <br />Cc: Maria Garretson (DRI), Vicki Hansen-Marks (DRI) <br />Attachment: Invoice for completion of Final Report <br /> <br />2215 Raggio Parkway, Reno, Nevada 89512-1095 <br />Phone (775) 673-7300 Fax (775) 673-7397 <br />
The URL can be used to link to this page
Your browser does not support the video tag.