My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SPDSS_Task33_2_Phase2_FieldStudyWorkPlan
CWCB
>
Decision Support Systems
>
DayForward
>
SPDSS_Task33_2_Phase2_FieldStudyWorkPlan
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/17/2013 9:15:41 AM
Creation date
6/9/2008 12:58:31 PM
Metadata
Fields
Template:
Decision Support Systems
Title
SPDSS Task 33.2 Phase 2 Field Study Work Plan for Alluvial and Bedrock Well Installation, Testing, and Water Level Monitoring
Description
This document presents the Field Study Work Plan for Alluvial and Bedrock Well Installation, Testing, and Water Level Monitoring. This document includes the memo and figures. Appendices are included in a separate document.
Decision Support - Doc Type
Task Memorandum
Date
8/13/2004
DSS Category
Groundwater
DSS
South Platte
Basin
South Platte
Contract/PO #
C153953
Grant Type
Non-Reimbursable
Bill Number
SB01-157, HB02-1152, SB03-110, HB04-1221, SB05-084, HB06-1313, SB07-122
Prepared By
CDM
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
39
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
South Platte Decision Support System Groundwater Component Task 33 Field Study Work Plan <br />for Alluvial and Bedrock Well Installation, Testing, and Water Level Monitoring <br />Appendices <br />Appendix A Phase 2 Engineering Cost Estimates <br />Appendix B Procedure for Field Documentation and Quality Assurance/Quality <br />Control <br />Appendix C Procedures and Specification for Drilling and Installation of Wells <br />Using Direct Push Technology <br />Appendix C1 Specification for Drilling and Installation of Wells Using <br />Direct Push Technology <br />Appendix C2 Geoprobe Large-Bore Soil Sampler, Standard Operating <br /> Procedure <br />Appendix C3 Geoprobe 1-in. x 2.5-in. OD and 1.5-in. x 2.5-in. OD <br /> Prepacked Screen Monitoring Wells, Standard Operating <br /> Procedure <br />Appendix C4 Direct Image Electrical Soil Conductivity System and <br /> Probing Procedures, Field Procedures Manual <br />Appendix D Specification for Drilling and Installation of Alluvial Monitoring <br /> Well using Hollow-Stem Auger Methods <br />Appendix E Specification for Geophysical Logging <br />Appendix F Specification for Drilling and Installation of Bedrock Monitoring <br /> Well <br />Appendix G Specification for Bedrock Well Development <br />Appendix H Procedure for Water Level Measurement <br />Appendix I Health and Safety Plan <br />Appendix J Specification for Flow Meter Certification and Data Logging <br />`~ ~ <br />Z:\SPDSS\10-CDM DELIVERABLES\PHASE 2 FIELD WORKPLAN\FINAL DRAFT\FINAL SPDSS TASK 33 2 WORK PLAN.DOC <br />
The URL can be used to link to this page
Your browser does not support the video tag.