Laserfiche WebLink
South Platte Decision Support System Groundwater Component Task 33 Field Study Work Plan <br />for Alluvial and Bedrock Well Installation, Testing, and Water Level Monitoring <br />Appendices <br />Appendix A Phase 2 Engineering Cost Estimates <br />Appendix B Procedure for Field Documentation and Quality Assurance/Quality <br />Control <br />Appendix C Procedures and Specification for Drilling and Installation of Wells <br />Using Direct Push Technology <br />Appendix C1 Specification for Drilling and Installation of Wells Using <br />Direct Push Technology <br />Appendix C2 Geoprobe Large-Bore Soil Sampler, Standard Operating <br /> Procedure <br />Appendix C3 Geoprobe 1-in. x 2.5-in. OD and 1.5-in. x 2.5-in. OD <br /> Prepacked Screen Monitoring Wells, Standard Operating <br /> Procedure <br />Appendix C4 Direct Image Electrical Soil Conductivity System and <br /> Probing Procedures, Field Procedures Manual <br />Appendix D Specification for Drilling and Installation of Alluvial Monitoring <br /> Well using Hollow-Stem Auger Methods <br />Appendix E Specification for Geophysical Logging <br />Appendix F Specification for Drilling and Installation of Bedrock Monitoring <br /> Well <br />Appendix G Specification for Bedrock Well Development <br />Appendix H Procedure for Water Level Measurement <br />Appendix I Health and Safety Plan <br />Appendix J Specification for Flow Meter Certification and Data Logging <br />`~ ~ <br />Z:\SPDSS\10-CDM DELIVERABLES\PHASE 2 FIELD WORKPLAN\FINAL DRAFT\FINAL SPDSS TASK 33 2 WORK PLAN.DOC <br />